Which of the following is an important success factor for any significant automation project?
A. The TAA must be designed for testability.You have executed an automated test suite for a product that was released into production. Although all the tests passed, there was a major failure in production in an area that was covered well by your automated tests. You have run the automated tests again and one of the tests is now failing and this is directly related to the production defect that was raised. You decide to run the automated test suite again on the same version of the SUT and the test now passes.
What SHOULD you do now to verify the validity of the automated tests?
A. Remove the intermittently failing test from the test suite and investigate the reason why the test sometimes passes and sometimes fails.Which of the following is an important consideration when evaluating the results from an automated test suite?
A. When tests fail intermittently, those test results should be ignored until the root cause of the failures can be determined.As a TAE you are evaluating a functional test automation tool that will be for several projects within your organization. The projects require that tool to work effectively and efficiently with SUT's in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
A. Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?
A. The code coverage achieved with the automated tests, for each new release of the SUTA TAS has been installed successfully in the target environment. Preliminary checks on configuration, installation, and setup have already passed. You now need to verify the correct behavior of the automated test suite itself.
Which activity is LEAST relevant at this point?
A. Check that expected results are defined for the automated testsWhat is the PRIMARY advantage of using abstraction in the TAA?
A. It makes it more flexible for future reuse and improvementsBecause an older product has suddenly found new popularity, management wants to update it to work with more modem operating systems and possibly add some new features. The previously used TAS is still available. You need a TAS that will work with the new SUT.
Which of the following is the most likely risk you will encounter and the mitigation strategy you should implement?
A. There may not be anyone in the organization with the knowledge to update the existing TAS so one of the existing test analysts will have to learn the language and syntax.You have been using a TAA to create a TAS for your project. You have found that the TAA report mechanism is too rigid for your use, so you created a more generic and flexible report engine.
What should you do with this new report mechanism?
A. Use it only in your TAS.If you are tracking the frequency that a test automation code reports a defect that is not really a defect, what metric are you gathering?
A. Tool scripting metricsNowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISTQB exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ISTQB-CT-TAE exam preparations and ISTQB certification application, do not hesitate to visit our Vcedump.com to find your solutions here.