ISTQB-CT-TAE Exam Details

  • Exam Code
    :ISTQB-CT-TAE
  • Exam Name
    :ISTQB Certified Tester Test Automation Engineer
  • Certification
    :ISTQB Certifications
  • Vendor
    :ISTQB
  • Total Questions
    :162 Q&As
  • Last Updated
    :May 29, 2026

ISTQB ISTQB-CT-TAE Online Questions & Answers

  • Question 91:

    In order to achieve re-use of a TAS, where SHOULD the design for reuse occur?

    A. At the code level
    B. At the framework level.
    C. At the TAS level
    D. At the TAA level

  • Question 92:

    If model-based testing is chosen as the main overall automation approach, how does that affect the TAA?

    A. Only the test execution layer is needed
    B. All layers remain relevant, but the test generation layer can generate tests from the model
    C. The test adaptation layer is no longer needed
    D. The model replaces all interfaces to the SUT

  • Question 93:

    Your company is new to test automation and as TAE. you have designed a TAS which successfully supports the SUT for the current project. There are other systems currently in operation which have been tested manually and more systems are planned over the coming years. Based on this success, your company requires test automation be rolled out to other current and future SUTs with consistency being a key objective.

    Which of the following is the BEST way to achieve that?

    A. Design a new TAS for each SUT, and manage each one through a dedicated automation support team.
    B. Install the current TAS into a central repository so that other tests on different SUTs use the same version of the TAS.
    C. Check for correct connectivity to internal and external systems to ensure that the TAS has been installed and configured correctly for each SUT.
    D. Develop a tool that keeps track of automation failures across the different SUTs and produces regular reports to stakeholders.

  • Question 94:

    You are implementing test automation for a project that has a business critical application A test execution tool is being used to run automated regression tests. The results from the test execution tool are very important and need to be 100% accurate.

    You want to merge the test automation results with the test management system that also records the manual test results so that managers can make informed decisions about the progress quickly.

    Which layer of the gTAA will be used to ensure the proper reporting occurs and the interfaces to the test management system are handled?

    A. The reporting layer
    B. The logging layer
    C. The execution layer
    D. The adaptation layer

  • Question 95:

    Consider a TAS that uses exclusively the APIs of a SUT. To make this TAS work, significant changes have been required to the SUT for testing purposes by adding a set of dedicated test interfaces to the APIs provided by the SUT. All the automated tests will use such test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.

    Based only on the given information, which of the following would you expect to be the most specific risk associated with this scenario?

    A. The connectivity from the TAS to the external/interface systems will not work
    B. The process of configuring the TAS will be error-prone due to manual intervention
    C. The automated test cases will not contain the expected result
    D. False alarms, that are unlikely to occur in real world, will be observed during testing

  • Question 96:

    You have been asked to implement test automation for a project that is not meeting its deadlines. After further analysis you discover that the manual testers are not able to keep up with the new feature testing because the regression testing is taking 75% of their time. As a result, the new features are being released with many defects and customers are complaining about the quality.

    Given this information, what metric SHOULD you be tracking to show the value of test automation for this project?

    A. Percentage of code covered by the test automation.
    B. Equivalent Manual Test Effort for the automated tests.
    C. Number of defects found by test automation.
    D. Percentage of builds accepted/rejected by the automated tests.

  • Question 97:

    You have been asked to develop test automation for a legacy system that is going to go through a series of infrastructure migrations. The scripts will be used to verify basic functionality during these infrastructure changes Your Test Analysts have some programming skills and need. a solution that is simple and fast.

    Maintainability of the scripts is not a consideration because no changes to the software are anticipated.

    Which of the following is the BEST scripting approach in this situation?

    A. Structured scripting
    B. Capture-replay scripting
    C. Model-Based scripting
    D. Linear scripting

  • Question 98:

    Which of the following will help ensure the success of a test automation project?

    A. The software is complex and difficult to test manually.
    B. The test systems have variable configurations and frequent data updates.
    C. The SUT is designed in such a way as to support automated testing.
    D. The Test Automation Framework (TAf)- uses the latest technology.

  • Question 99:

    Your project is transitioning from manual to automated testing. You have decided to implement a pilot project so that lessons learned can inform future time estimates and schedules.

    Which two of the following represent the types of test cases that are MOST suited to a test automation pilot project?

    a)- High added value test cases that require little effort to automate.

    b)- Test that are run infrequently as these will be simpler to automate.

    c)- Reliability test cases that can show added value soon.

    d)- Technically challenging test cases to provide the best validation of manual test conversion.

    e)- Tests that are least Important to the business as these are safer to trial.

    A. a and b
    B. a and c
    C. b and d
    D. c and e

  • Question 100:

    Which of the following is NOT an advantage of test automation?

    A. The ability to perform tests which would be difficult or impossible to execute manually
    B. The ability to run more tests in less time and therefore to make it possible to run them more often
    C. The ability to find more defects with the same tests, compared to executing the same test manually
    D. The ability to enable a better use of skilled testers by freeing them from repetitive and boring tasks

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISTQB exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ISTQB-CT-TAE exam preparations and ISTQB certification application, do not hesitate to visit our Vcedump.com to find your solutions here.