ICGB Exam Details

  • Exam Code
    :ICGB
  • Exam Name
    :IASSC Certified - Lean Six Sigma Green Belt
  • Certification
    :IASSC Certifications
  • Vendor
    :IASSC
  • Total Questions
    :143 Q&As
  • Last Updated
    :Jul 13, 2026

IASSC ICGB Online Questions & Answers

  • Question 81:

    Unequal Variances can be the result of differing types of distributions.

    A. True
    B. False

  • Question 82:

    With the use of Statistics we define the population to be a large enough sample set of data such that you can analyze it and draw conclusions as to all of the data.

    A. True
    B. False

  • Question 83:

    Lean Six Sigma's general approach to solving significant challenges related to a process is called _________________.

    A. DOE
    B. SIPOC
    C. DMAIC
    D. FMEA

  • Question 84:

    Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).

    A. The lower Control Limit for the R chart is equal to zero
    B. The Control Limits are wider than the customer specification limits
    C. A process is in Statistical Control before implementation of SPC
    D. Attempt to use SPC for tracking transaction times at a warehouse
    E. Indication of the specification limits on the Control Chart

  • Question 85:

    The proper functioning of a Visual Factory is dependent upon which of these?

    A. Technically skilled workers
    B. Work space with active 5S
    C. Availability of visual tools
    D. Breakthrough projects

  • Question 86:

    The Central Limit Theorem helps us understand the ___________ we are taking and is the basis for using sampling to estimate population parameters.

    A. Analysis
    B. Kurtosis
    C. Risk
    D. Route

  • Question 87:

    Which of these are correct if Cpk Upper is 2.0 and Cpk Lower is 1.0?

    A. The process is not stable.
    B. The process is shifted to the left.
    C. Cpk must be reported as 1.0.
    D. The process Mean is 1.5.

  • Question 88:

    The difference between the largest observation and the smallest observation in the data set is known as the _______________.

    A. Breadth
    B. Range
    C. Spread
    D. Median

  • Question 89:

    The 5 Why Analysis is only useful if the possible independent variable can be broken down into five possible causes.

    A. True
    B. False

  • Question 90:

    Which element of waste best describes "the cost of an idle resource"?

    A. Waiting
    B. Motion
    C. Inventory
    D. Correction

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IASSC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ICGB exam preparations and IASSC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.