DRAG DROP
A customer needs a new environment to support an ERP system. The sizing information you received shows the following requirements:
1.
3 servers with: quad processors, 256 GB RAM, and 10Gb dual-port NICs 10 TB of high performance shared storage
2.
cloud-based performance monitoring and analytics
3.
The customer prefers rack mounted equipment.
Identify the components that will meet the customer requirements, then drag the correct components on the left to their appropriate location in the environment on the right.
Select and Place:

What can you do when installing an HPE switch to provide protection from electrostatic discharge?
A. Install the switch in a rack with rubber insulators.In which layer of the OSI model would you find an IP address?
A. ApplicationWhat connection type is identified by the following address type? B4-D5-BD-9F-0A-C3
A. IPV6When should you use the HPE Switch Selector?
A. when you need to list the price information of the switchesYou configured a port on an HPE FiexFabric 5900 series switch that is connected to a VMware ESXi server to support multiple VLANs

Given the configuration above, what should happen to any untagged traffic coming from the VMware ESXI host?
A. It will be transmitted in vlan 1.Refer to the exhibit.

A customer has been using VEEAM and the HPE StoreOnce 3620 shown in the exhibit to backup their environment. The customer's legal team has asked to double their retention times for all backup sets, and they are starting to run out of space on the StoreOnce.
Which options could you recommend that the customer add to their existing configuration to accommodate the new requirement? (Select two. Each option represents a separate solution.)
A. HPE StoreOnce Cloud Bank StorageA system administrator's performing the BIOS/Platform configuration of a DL380 Gen10 server. You notice the amber health LED. The health status of which solution components can be verified with embedded UEFI Diagnostics? (Choose two.)
A. UEFI shellHOTSPOT
A solution integrator is installing new equipment to the rack.
Click the recommended location for HPE R/T3000 Extended Runtime Module.
Hot Area:

You need to install 10 HPE ProLiant servers in an environment without DHCP. Which tool can you use to set up remote management?
A. Intelligent ProvisioningNowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE0-V14 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.