If the ECC800 is configured with a SIM card, the SIM card should be installed in ().
A. ECC800 power module slot
B. ECC800 main control module left slot
C. Below the ECC800 antenna port
D. USB interface
One NetCol520 chilled water distribution unit can support a maximum of ( ) NetCol5000-C
A. 12
B. 10
C. 8
D. 6
After installing a top air outlet component for the UPS5000, need to set enabled for the top air outlet component on LCD.
A. TRUE
B. FALSE
A maximum of ( ) smart ETH gateways can be cascaded.
A. 8
B. 16
C. 32
D. 44
Whether the water distribution unit is equipped or not is based on installation scenarios.
A. TRUE
B. FALSE
When installing the power line on the UPS5000-E, if there are different sources on the main-lines and bypass, you need to remove the copper bars connected to the bypass and main lines first, and then connect the main circuit and bypass input respectively.
A. TRUE
B. FALSE
The () port is not on the smart ETH gateway.
A. PWR_IN
B. PWR_OUT
C. PoE
D. AI/DI
The NetCol5000-A25 kW supports light load dehumidification.
A. TRUE
B. FALSE
When four UPS2000-G-20K parallel setting is "3+1", the capacity of the system is ( ) KVA.
A. 80
B. 40
C. 60
D. 100
NetCol5000-A25 kW indoor unit needs neutral wires.
A. TRUE
B. FALSE
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Huawei exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your H12-425 exam preparations and Huawei certification application, do not hesitate to visit our Vcedump.com to find your solutions here.