ECP-383 Exam Details

  • Exam Code
    :ECP-383
  • Exam Name
    :Ericsson Certified Associate - Radio Network Optimization
  • Certification
    :Ericsson Certifications
  • Vendor
    :Ericsson
  • Total Questions
    :62 Q&As
  • Last Updated
    :Jul 14, 2026

Ericsson ECP-383 Online Questions & Answers

  • Question 31:

    Review the exhibit.

    A new residential area has recently been built showing a lack of 3G uplink coverage as shown in the exhibit. The terrain is flat and all the buildings in the area are 20 meters in height with no other relevant direct obstacles. What should be applied to cells A_l and 8_1 to provide 3G service to the new area knowing that both cells have a soft handover (SHO) factor of 1.9?

    A. Increase the CPICH power.
    B. Increase the electrical downtilt.
    C. Reduce the antenna height.
    D. Change the azimuth.

  • Question 32:

    After an optimization meeting, an operator decides to double the transmitted power of an LTE cell. To test the effect of this change, a static test is performed before and after the change. Which statement is correct in this scenario?

    A. The RSRP received by the UE remains stable.
    B. The variation of the RSRP will depend on the bandwidth of the cell.
    C. The RSRP received by the UE is increased by six dB.
    D. The RSRP received by the UE is increased by three dB.

  • Question 33:

    You are making a frequency plan for a new site and you need to create an interference matrix for new GSM sectors. In this scenario, which three inputs should you use? (Choose three.)

    A. location area code plan
    B. propagation model
    C. type of terrain in the area
    D. BAL measurements made by UEs
    E. antenna height

  • Question 34:

    An operator receives customer complaints from an indoor location. The Issues result from a bad neighbor plan in a single RAT and frequency network. Which two optimization processes would you use to resolve the problem? (Choose two.)

    A. call trace based neighbor optimization
    B. drive test based neighbor optimization
    C. PM counter based neighbor optimization
    D. prediction based neighbor optimization

  • Question 35:

    Performance Management Statistics have recently shown a sharp rise in received interference power on an LTE site during the busiest hours. A collocated WCDMA base station has recently acquired a new carrier and upgraded power amplifier. The upgrade correlates with the sharp rise in received interference power.

    What are two appropriate actions to solve this problem? (Choose two.)

    A. Request or perform a build audit of the newly upgraded collocated WCDMA site.
    B. Increase the power amplifier on the impacted collocated LTE sectors.
    C. Reduce the hsPowerMargin parameter to make more power available for HSDPA.
    D. Review the site design in consultation with the Ericsson collocation and coexistence guidelines.

  • Question 36:

    How would you connect a Baseband module in the eNodeB to an Antenna Integrated Radio (AIR)?

    A. using optical fiber
    B. using a microwave link
    C. using an RJ-45 Ethernet cable
    D. using Bluetooth

  • Question 37:

    What is a purpose of Radio Resource Management (RRM) parameter optimization tools?

    A. coverage predictions
    B. azimuth adjustment
    C. geo-location procedures
    D. traffic balancing

  • Question 38:

    Review the exhibit.

    An operator's LTE single layer network has a cell not carrying enough traffic. To increase the traffic carried by the cell, the operator decides to modify the Idle mode behavior of the cell. Values for the qRxLevMin and qQuaimin parameters are currently set to -120 dBm and -12 dB. Referring to the exhibit, which two configurations would be used to potentially increase the traffic carried by this cell? (Choose two.)

    A. Set the qRxLevMin parameter to -117 dBm.
    B. Set the qQualMin parameter to -15 dB.
    C. Set the qQuaiMin parameter to -9 dB.
    D. Set the qRxLevMin parameter to -123 dBm.

  • Question 39:

    A customer is deploying VoLTE and complains about high voice drop rates and voice quality degradation at the cell edge in most LTE cells in the area. The network has a dense WCDMA coverage on the 700 MHz band and patchy LTE coverage on the 2100 MHz band.

    Which two features would you activate to solve this problem? (Choose two.)

    A. DRX
    B. 256 QAM DL
    C. TTI Bundling
    D. SRVCC Handover to UTRAN

  • Question 40:

    What is a benefit of Remote Radio Unit (RRU) deployment compared to a standard Radio Unit (RU) deployment?

    A. RRU consumes less power.
    B. RRU provides for easier legalization of the equipment.
    C. RRU provides easier deployment and maintenance.
    D. RRU has lower feeder loss.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Ericsson exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ECP-383 exam preparations and Ericsson certification application, do not hesitate to visit our Vcedump.com to find your solutions here.