  • Question 11:

    An administrator has installed the iDRAC Service Module in the OS on a compute sled, they are unable to use its features in the iDRAC web GUI. What is the likely cause of this issue?

    A. OS to iDRAC pass-through feature is not enabled in the iDRAC

    B. iDRAC Express license is installed

    C. OS and iDRAC are configured on different networks

    D. Installed OS is not supported

  • Question 12:

    What configuration is supported for a fully populated MX740c compute sled?

    A. 1 Fabric B mezz card 1 Fabric C mezz card with Fabric A being integrated into the system board

    B. 1 Fabric A mezz card 1 Fabric B mezz card with Fabric C being integrated into the system board

    C. 2 Fabric A mezz cards 2 Fabric B mezz cards 2 Fabric C mini-mezz cards

    D. 1 Fabric A mezz card 1 Fabric B mezz card 1 Fabric C mini-mezz card

  • Question 13:

    Where is a valid storage location for extracting the full MX7000 chassis logs package?

    A. VMFS

    B. FTP

    C. CIFS

    D. CSV

  • Question 14:

    What automatically opens a support case with technical support and collects the PowerEdge MX system state information that is required for troubleshooting an issue, then sends it securely to Dell EMC?

    A. OpenManage Essentials

    B. SupportAssist Collections

    C. OpenManage Enterprise

    D. SupportAssist Enterprise

  • Question 15:

    An administrator is asked to install and power-on a new MX740c sled in an MX7000 chassis. The administrator inserts the sled and presses the power button. They notice that the power button LED is blinking green. After a short time power button turns to solid green and the server finally turns on.

    What operation was in progress when the power button was blinking green?

    A. iDRAC was booting

    B. Lifecycle Controller update was in progress

    C. Lifecycle Controller was taking firmware inventory

    D. iDRAC was updating firmware

  • Question 16:

    Refer to the exhibit.

    How many internal server-facing ports are available on this I/O module for the MX7000 chassis?

    A. 2

    B. 8

    C. 16

    D. 24

  • Question 17:

    An administrator is configuring a fully populated MX5016s storage sled to be accessed by four MX740c compute sleds. Each compute sled has an H745P Jumbo PERC installed. The disks in the storage sled are evenly distributed across all compute sleds using a Drive-Assigned storage configuration.

    What is the maximum number of disks that each compute sled can detect from the MX5016s?

    A. 1

    B. 2

    C. 4

    D. 16

  • Question 18:

    A technician has replaced an MX chassis tub. They complete the tub installation and power on the chassis. They notice that the KVM is no longer functional. What should the technician do after confirming the KVM feature is still enabled in OME-M?

    A. Ensure all cables connecting the tub to the left ear control panel are connected properly

    B. Ensure all power supplies are connected and powered-on

    C. Ensure all cables connecting the tub to the right ear control panel are connected properly

    D. Ensure all installed Management Modules are connected to the network

  • Question 19:

    A technician replaces a failed Management Module in an MX7000 chassis group. After the technician leaves the site, the administrator reports that the lead chassis is no longer able to communicate with its members. How can OME-M be used to confirm the cabling configuration?

    A. View the health status of the lead Chassis Management Module

    B. View the health status of the lead Chassis Management ports

    C. View the I/O module topology map from the lead chassis

    D. View the topology map from the Group Lead

  • Question 20:

    An administrator has been tasked with specifying hardware for a deployment having the following requirements:

    4 node cluster within a single MX7000 chassis Each node needs a minimum of 6x 2.5" drives 3 TB of memory and 64 physical CPU cores per node

    What is the maximum hardware configuration that meets the requirements?

    A. MX740c with no storage sleds

    B. MX740c with MX5016s storage sleds

    C. MX840c with no storage sleds

    D. MX 840c with MX5016s storage sleds

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only EMC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your DES-4421 exam preparations and EMC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.