Question 1 Multiple choice

Besides switches, what other types of resources would be discovered in PowerFlex Manager? (Select 3)

  1. A

    Virtual Machines

  2. B

    Nodes

  3. C

    VMware vCenter

  4. D

    PowerFlex Gateway

  5. E

    CloudLink Center

Show answer and explanation

Correct answers: B, C, D

Question 2 Single choice

Where are DNS server records configured when deploying the PowerFlex Management Controller VMs?

  1. A

    hosts

  2. B

    Config

  3. C

    Routes

  4. D

    ifcfg-eth<#>

Show answer and explanation

Correct answer: A

Question 3 Multiple choice

Which two steps must be completed to finish configuring the Management Controller, once the PowerFlex has been deployed? (Select 2)

  1. A

    Enable VMware vSphere HA and DRS.

  2. B

    Configure a File Services node.

  3. C

    Set up a NAS server.

  4. D

    Delete vSwitch0.

  5. E

    Reconfigure MDM roles.

Show answer and explanation

Correct answers: A, D

Question 4 Single choice

Which tool can be used to install the SDR component in a PowerFlex 4.
x cluster?

  1. A

    vSphere Plug-In

  2. B

    PowerFlex Manager

  3. C

    PowerFlex WebUI

  4. D

    Installation Manager

Show answer and explanation

Correct answer: D

Question 5 Single choice

How many days may a PowerFlex cluster remain in a production environment after deployment before a license is required for continued operation?

  1. A

    30 days

  2. B

    120 days

  3. C

    90 days

  4. D

    60 days

Show answer and explanation

Correct answer: C

Question 6 Single choice

What is the minimum number of nodes required to create a production PowerFlex Management Platform Cluster?

  1. A

    9

  2. B

    1

  3. C

    5

  4. D

    3

Show answer and explanation

Correct answer: D

Question 7 Single choice

PowerFlex Management Controller VMs are being deployed.
Once the OVAs have been successfully deployed, what should be done before powering them on?

  1. A

    Upgrade the VM hardware version.

  2. B

    Add a second SCSI controller to all the PFMC 2.0 nodes.

  3. C

    Add a second vNIC to all the PFMC 2.0 nodes.

  4. D

    Upgrade the version of VMware Tools.

Show answer and explanation

Correct answer: C

Question 8 Multiple choice

Which three networks are configured during the PowerFlex implementation process? (Select 3)

  1. A

    flex-node-mgmt

  2. B

    pfmc-sdc-mgmt

  3. C

    pfmc-sds-mgmt

  4. D

    pfmc-vmotion

  5. E

    flex-node-data

Show answer and explanation

Correct answers: A, B, E

Question 9 Drag & drop

DRAG DROP

Place the PowerFlex implementation steps in the correct order.

Question diagram
Show answer and explanation
Correct answer diagram
Question 10 Multiple choice

Which four prerequisites must be met before deploying PowerFlex on the Management Controller? (Select
4.

  1. A

    Set up hardware affinity.

  2. B

    Deploy VMware vCenter.

  3. C

    Install and configure ESXi on the Management Controller.

  4. D

    Deploy and configure the storage VMs.

  5. E

    Configure the switch ports.

  6. F

    Configure VM HA and DRS.

Show answer and explanation