Kaizens or Kaikakus and Six Sigma projects are intended to create incremental process improvements
versus breakthrough, significant improvements.
Show answer and explanation
Correct answer: B
CSSBB Real Exam Questions
300 questions available · Page 1 of 30
Updated Exam DumpsVerified AnswersPass Guarantee
Kaizens or Kaikakus and Six Sigma projects are intended to create incremental process improvements
versus breakthrough, significant improvements.
Correct answer: B
Contingency Tables are used to test for association, or dependency, between two or more classifications.
Correct answer: A
Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.
Correct answer: A
For Attribute Data, Process Capability is defined as the average proportion of nonconforming products.
Correct answer: A
A Full Factorial experiment using a 2 level 4 factor approach has been proposed to test the viability of an extrusion machine experiment.
How many treatment combinations will this approach involve?
Correct answer: B
If you can Poka-Yoke a defect out of the process entirely then you do not need use SPC on the characteristic of interest in the defect.
Correct answer: A
The two types of data that are to be used in Statistical Analysis are Attribute and Variance.
Correct answer: B
How many experimental runs exist in a Full Factorial and fully randomized design for 4 factors with 2 replicates for the Corner Points and no Center Points? The factors in the experiment are only at 2-levels.
Correct answer: B
Which of these elements are not included in Implementation plans?
Correct answer: C
Using this partial Z Table, how many units from a month's production run are expected to not satisfy customer requirements for the following process?
Upper specification limit: 7.2 Lower specification limit: 4.3 Mean of the process: 5.9 Standard Deviation:
0.65 Monthly production: 450 units
Correct answer: C