CLSSBB Exam Details

  • Exam Code
    :CLSSBB
  • Exam Name
    :Certified Lean Six Sigma Black Belt (LSSBB)
  • Certification
    :Six Sigma Certifications
  • Vendor
    :Six Sigma
  • Total Questions
    :639 Q&As
  • Last Updated
    :Jul 12, 2026

Six Sigma CLSSBB Online Questions & Answers

  • Question 391:

    Relative to a Design of Experiments the term ________________ refers to variables being a linear combination of each other.

    A. Mirror Image
    B. Directly Parallel
    C. Collinear
    D. None of the above

  • Question 392:

    Which of the following is an element of standard work?

    A. Takt time
    B. Product cost
    C. Product value
    D. Maximum inventory

  • Question 393:

    When a Belt implements an improvement that is automated thus requiring no particular understanding for use he has applied which Lean tool?

    A. Mistake Proofing
    B. Kaizen Event
    C. 5S
    D. None

  • Question 394:

    A set of data from a process has 8 readings per sample and 50 samples. The mean of the 50 sample means is 12.62. The mean of the 50 ranges is 0.18.Find control limits for the R chart.

    A. 0.10 and 0.25
    B. none and 0.33
    C. 0.02 and 0.33
    D. none of the above

  • Question 395:

    A set of data from a process has 8 readings per sample and 50 samples. The mean of the 50 sample means is 12.62. The mean of the 50 ranges is 0.18. Find the control limits for the xbar chart.

    A. 12.55 and 12.69
    B. 12.11 and 13.13
    C. 12.54 and 12.70
    D. none of the above

  • Question 396:

    Find the value of (12) in the ANOVA table. Assume:

    A. 16.4
    B. 3.2
    C. 18.6
    D. 23.2
    E. 4.54
    F. 12.2
    G. 0.525
    H. 2.82
    I. 1.48
    J. 35.4

  • Question 397:

    Three Standard Deviations on left and right side of the mean would include what % of the total data points in Normal Distribution?

    A. 68%
    B. 97%
    C. 99%
    D. 95%

  • Question 398:

    Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a _________ before anything moves.

    A. Sign-off
    B. Signal
    C. Bell to ring
    D. Work order

  • Question 399:

    Accuracy can be assessed in several ways and a fairly accurate means of measurement is visual comparison.

    A. True
    B. False

  • Question 400:

    The average number of defects is 21.6. Find the upper control limit for the c-chart.

    A. 26.4
    B. 24.6
    C. 18.8
    D. 26.2
    E. none of the above

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CLSSBB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.