  • Question 71:

    Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3 correct Answers to this question.

    A. Reason code

    B. Scenario ID

    C. Attributes

    D. Key figure type

    E. Modified date

  • Question 72:

    What function would you use to configure a year-to-date calculation?

    A. Rolling Aggregation

    B. Last Period Aggregation

    C. Cumulative Aggregation

    D. Dynamic Rolling Aggregation

  • Question 73:

    You want to set up demand sensing to analyze demand changes in execution or close to execution windows. Which of the following conditions must you consider during the setup? Note: There are 2 correct Answers to this question.

    A. At setup test the system to run the demand sensing (full) algorithm weekly and the demand sensing (update) on a daily basis.

    B. The result generates sensed demand data at the monthly time granularity for the full time horizon

    C. Set up the forecast model to be executed at product-location level.

    D. It is mandatory to load historical lag-based snapshot data.

  • Question 74:

    You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed? Note: There are 2 correct Answers to this question.

    A. Planning results can be generated faster by the optimizer.

    B. Prioritization of demand elements one by one is achieved by heuristics.

    C. Push and Pull production models are used by the optimizer.

    D. Finite heuristics can achieve demand prioritization and pegging.

  • Question 75:

    Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are 2 correct Answers to this question.

    A. Manual creation of feasible constrained plans

    B. Finite resource planning

    C. A basic demand planning process

    D. An advanced demand planning process

  • Question 76:

    Which of the following configuration options are part of the new key figure creation process? Note: There are 3 correct Answers to this question.

    A. Hiding or displaying totals for the key figure

    B. Enabling planning notes for the key figure

    C. Setting permitted planning levels

    D. Setting disaggregation logic for the key figure

    E. Enabling fixing for the key figure

  • Question 77:

    What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct Answers to this question.

    A. Assign more appropriate inventory algorithms to planning objects.

    B. Tailor your forecast strategy and inventory optimization to segment characteristics.

    C. Identify inventory items that require closer attention.

    D. Analyze forecast accuracy by product class.

  • Question 78:

    While modeling for a large machine with high capital needs, you need it to run cost effectively with minimum utilization, even if it means producing more than demand. Which solution would apply to this scenario? Note: There are 2 correct Answers to this question.

    A. Capacity leveling will be possible for production and storage resources.

    B. Excess stock can be generated and will need to be staged in an overflow warehouse.

    C. Enough demands can be pulled forward and pull production will occur.

    D. Balance can be achieved between excessive prebuild and minimum utilization by incorporating violation costs.

  • Question 79:

    You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing. Which of the following parameters can you model to plan production with extra shift(s)?

    A. Incremental production values

    B. Capacity expansion with additional costs

    C. Production source validity at the start of seasonal peak

    D. Adjusted production interactive values

  • Question 80:

    Which of the following can be used as inputs for inventory level optimization? Note: There are 2 correct Answers to this question.

    A. Target inventory level

    B. Lead time variability

    C. Lot sizes

    D. Reorder point

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_IBP_2202 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.