Question 1 Single choice

What supports the Easy Tier function for an S822?

  1. A

    (8) drives with a split backplane

  2. B

    (12) drives with a split backplane

  3. C

    (8) drives with a second SAS controller

  4. D

    (12) drives without split backplane

Show answer and explanation

Correct answer: C

Question 2 Single choice

A customer wants to install a POWER8 tower system at a remote site. The system will run Red Hat Linux.

Which system is the best option for the requirement?

  1. A

    S812L

  2. B

    S822L

  3. C

    S824

  4. D

    S814

Show answer and explanation

Correct answer: B

Question 3 Single choice

A customer with IBM i and AIX platforms wants to take advantage of a recently acquired XIV Storage System, TS3500 and POWERS system. They are planning to implement 10 LPARs and need to have access to the tape library for SAN backups. The customer also wants to minimize the downtime by VIO Server maintenance.

Which option will satisfy their requirements?

  1. A

    (1) VI0 Server, LPARs using SSP for disks, and NPIV for tape library

  2. B

    (2) VIO Servers, All LPARs using NPIV virtualization

  3. C

    (2) VIO Servers, LPARs using vSCSI for disks, and NPIV for tape library

  4. D

    (1) VIO Server, LPARs using vSCSI for disks, and NPIV for tape library Manage the VIO Server updates with alternate disk update method

Show answer and explanation

Correct answer: C

Question 4 Single choice

Which power option is provided with the S822?

  1. A

    (1)1400 Watt 200-240 Volt

  2. B

    (2) 1400 Watt 200-240 Volt

  3. C

    (2)1400 Watt 125-240 Volt

  4. D

    (1)1400 Watt 125-240 Volt

Show answer and explanation

Correct answer: B

Question 5 Single choice

Which of the following statements correctly describes a difference between the S814 and S824?

  1. A

    The S814 is a tower server and the S824 can be either a tower or rack mounted server

  2. B

    The S814 has one socket and the S824 has up to two sockets

  3. C

    The S814 can have one or two sockets and the S824 has four sockets.

  4. D

    The S814 uses 1U of rack space and the S824 uses 2U of rack space.

Show answer and explanation

Correct answer: B

Question 6 Single choice

A customer has a Power 740 with 16 cores and 64GB RAM, running an Oracle database. The server is attached to an EXP24S with 20 disks 300GB 10K RPM and has been experiencing performance issues.
After an analysis there were some findings:

Average CPU usage for the database is 30%

Average Memory usage is 60%

High I/O waits are being experienced, around 50% of total CPU

An Oracle sales representative ran a POC of an Exadata X4-2 Half Rack to help with the performance issues.

The performance on Exadata was better than the existing solution, so the customer called IBM, considering a migration to a new Oracle solution.

Which response is appropriate to defend the IBM solution?

  1. A

    Exadata X4-2 Half Rack has four servers with two sockets each. It should be compared with the performance of a POWER 770 which can also scale up to eight sockets. IBM can propose an upgrade scenario to even move partitions without downtime with LPM.

  2. B

    Exadata is a solution comprised of servers, disk storage, flash storage, networking and software. Your server is apparently fine, but there might be a problem with storage. IBM can propose a faster storage solution, allowing you to keep the server and optimize your costs.

  3. C

    Exadata might have run the Oracle database faster due to the fact that it is powered by Oracle SPARC
    T5 processors which were designed for Oracle software. On the other hand, other workloads will definitely run slower, so you should stick to the existing solution for a balanced performance across your environment.

  4. D

    Exadata is comprised of a cluster of servers connected by Infiniband. You are comparing this to a single server. IBM can propose a second server with an Infiniband network to address this issue.

Show answer and explanation

Correct answer: A

Question 7 Single choice

What is the number of threads that can be processed for maximum throughput on a POWER8 core?

  1. A

    12

  2. B

    4

  3. C

    8

  4. D

    2

Show answer and explanation

Correct answer: C

Question 8 Single choice

An AIX customer is running AIX 5.3 on a POWER7 machine and wants to run this workload on a POWER8 server without upgrading their operating system.

What is their best option to migrate their workload?

  1. A

    Power HA failover

  2. B

    Live Partition Mobility

  3. C

    Power VC

  4. D

    Versioned WPAR

Show answer and explanation

Correct answer: D

Question 9 Single choice

A customer wants to use SAN Flash Copy with Geographic Mirroring to synchronize an IBM i application between two sites. It is required that the application can be halted and moved to the remote system without disrupting other applications.

Which of the following describes a required application characteristic to support these requirements?

  1. A

    The application code and data must reside in an IBM i user Auxiliary Storage Pool (ASP).

  2. B

    All the application data objects must be defined to remote journaling.

  3. C

    The application code and data must reside in the IBM i system Auxiliary Storage Pool (ASP).

  4. D

    The application code and data must reside in an IBM i Independent Auxiliary Storage Pool (ASP).

Show answer and explanation

Correct answer: D

Question 10 Single choice

A customer wants to save on IBM i licensing costs:

They have three configurable processors and one IBM i license.
LPAR1 is running IBM i with .5 CPU
LPAR2 is running IBM i with .5 CPU
LPAR3 is running AIX with 1 CPU
All of the LPARs are uncapped.
They want to limit the IBM i LPARs to using one core.

How can the customer enforce the limit and save on their IBM i licensing costs?

  1. A

    Put the IBM i LPARs in a shared processor pool with one core.

  2. B

    Put the AIX LPAR in a shared processor pool with one core.

  3. C

    Set the entitlement of each IBM i LPAR to "one"

  4. D

    Change the AIX partition to have .5 CPU entitlement.

Show answer and explanation

Correct answer: A