C4070-604 Exam Details

  • Exam Code
    :C4070-604
  • Exam Name
    :IBM System z Technical V5
  • Certification
    :IBM Certifications
  • Vendor
    :IBM
  • Total Questions
    :57 Q&As
  • Last Updated
    :Jul 09, 2026

IBM C4070-604 Online Questions & Answers

  • Question 41:

    A customer is migrating to z114 and z/VM V6.1. The existing z9 BC will be used as cold standby system in a separate datacenter. Which of the following is correct?

    A. In order to run all guests on the z9 BC both, z9 BC and z114, have to run z/VM V6.1
    B. The latest version of z/VM supported on z9 BC is z/VM V5.4. However the guests stay compatible.
    C. In order to keep z/VM guests both systems (z114 and z9 BC) need to run z/VM V5.4.
    D. The customer has to run z/VM V6.1 as a second level guest on the z9 BC z/VM V5.4The customer has to run z/VM V6.1 as a second level guest on the z9 BC? z/VM V5.4

  • Question 42:

    A post installation support plan must be in place after the sale of the System z. Which of the following is the best way to do this?

    A. Discuss typical problem resolution with the customer technical staff
    B. Create a formal Customer Support Plan document and review it with the customer for agreement
    C. The hardware SSR/CE is responsible for the post install support plan, the technical specialist should ensure this is complete
    D. The technical specialist should create a list of help desk phone numbers and hardware dispatch contacts to review with the customer

  • Question 43:

    What is a differentiator of the System z compared to other hardware platforms?

    A. System z utilizes faster memory to accelerate application execution.
    B. System z utilizes SAP for offloading I/Os from standard processors.
    C. System z platform provides spare processors to improve availability.
    D. System z is the only platform that exploits memory protection technologies.

  • Question 44:

    A customer is looking for a solution that delivers a workload management across the platforms that run his core application. Additionally he is interested in a continuous availability solution that controls all components of the application independent of the platform that is used for the deployment.

    Which of the following makes zEnterprise the best match to those requirements?

    A. The new Infiniband coupling link of z196 offer the opportunity to interconnect all platforms. The Unified Resource Manager delivers a central tool to control all events.
    B. z/OS offers with Parallel Sysplex and WLM a best of breed solution. For the distributed part Tivoli System Automation for Multi Platforms (TSAMP) delivers the required functionality.
    C. The combination of Unified Resource Manager, GDPS and TSAMP meets all requirements without changes to the applications.
    D. The customer can consolidate all application parts either on z/OS or on Linux on System z to meet the requirements.

  • Question 45:

    A customer has a very large z196 Complex with 8 CEC in a Sysplex. The customer would like IBM to perform a study to help move to the latestA customer has a very large z196 Complex with 8 CEC? in a Sysplex. The customer would like IBM to perform a study to help move to the latest Infiniband 12X Links.

    Which of the following is the correct tool to provide this?

    A. BWA
    B. CF Sizer
    C. zTPM
    D. zCP3000

  • Question 46:

    A zEnterprise customer is considering consolidating multiple CPCs.

    What basic technical factors should be included when performing a CEC consolidation analysis?

    A. Discuss implications of IPv6 on capacity requirements
    B. Ask if SOA is included in Application Development methodology futures.
    C. Involve customer application and datacenter managers on their views about personnel relocation.
    D. Integrate all SCP LPAR definitions and CEC weights, then consider possible elimination or integration options.

  • Question 47:

    A System z technical specialist is designing a z196 solution. Which of the following may be selected using eConfig?

    A. Select the total amount of user memory and the number and type of I/O ports
    B. Select the number and type of I/O cages and I/O drawers
    C. Manually assign the PCHIDs and CHPIDs
    D. Select how much memory to put on each book for multi-book processors.

  • Question 48:

    A customer expresses concern that one of their key ISV for z/OS is not willing to support their software on zEnterprise. A customer expresses concern that one of their key ISV? for z/OS is not willing to support their software on zEnterprise.

    Which of the following is the first action for the IBM or Business Partner Technical Team to take?

    A. Join a previously arranged customer meeting with the ISV to discuss
    B. Retain the existing processor to run this ISV software
    C. Notify the ISV their contract will be terminated and replaced with IBM software
    D. Offer to share this concern with our PartnerWorld board for possible de-certification as an ISV.

  • Question 49:

    The Solution edition for Data Warehousing includes which of the following components?

    A. Foundational z/OS and DB2 for z/OS software to deploy a warehousing database on z/OS
    B. DB2 for Linux on System z with partitioning feature
    C. Information Management software and OPTIM Data Privacy Solution
    D. A pre-defined hardware configuration of 2 general processors and 2 zIIPs with 16 GB of memory for LPAR definition

  • Question 50:

    A presales TDA meeting is in review process the Technical Specialist finds a problem with the configuration. The incorrect power cord on the z196 was ordered. The machine order was placed and has a Plant Order Number in the system. Which of the following is the correct action to resolve problem?

    A. Reschedule the presales TDA
    B. Resolve with the customer at the planning meeting
    C. Request the customer change the power supply
    D. Advise the sales specialist to alter the order to correct the power cord

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C4070-604 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.