  • Question 21:

    Which of the following tools provides a financial analysis for a distributed server consolidation on System z opportunity at no cost to the customer?

    A. BVWA
    B. RACEv
    C. SCON
    D. PRA

  • Question 22:

    A new customer bought a zEnterprise 114 and zBX. The customer questioned why there are two HMCs configured. Which of the following is the reason that the HMC needs to be redundant?

    A. zEnterprise 114 and zBX will have a dedicated HMC respectively
    B. The Support Element (SE) is no longer available
    C. All zEnterprise servers are configured with 2 sets of HMC by default
    D. Two HMCs are required to preserve Ensemble state configuration

  • Question 23:

    A customer is planning an upgrade to a z196 from a System z9. They still have a high number of ESCON I/O channels on the current machine. The customer has no immediate plans to migrate away from their ESCON attached I/O devices.

    Which of the following actions should the Technical Specialist suggest?

    A. The customer should purchase ESCON to FICON convertors for each active ESCON port.
    B. ESCON channels are still supported on the System z196, no additional steps are required
    C. IBM Global Services may conduct a onsolidation Analysis to help better understand the customer environment.IBM Global Services may conduct a onsolidation Analysis to help better understand the customer environment.
    D. The customer must verify the number of active ESCON ports required. Fewer than 240 ports may be carried over on the z196. Additional ESCON ports require ESCON to FICON convertors.

  • Question 24:

    During which of the following activities do the customer and the technical specialist define post installation support?

    A. During the TDA (Solution Assurance)
    B. When establishing the system ship date
    C. When configuring the System z using eConfig
    D. During the installation of the equipment by the CE

  • Question 25:

    A customer has a Power with AIX server farm with network connectivity to a zEnterprise processor. Which of the following would represent a potential zBX opportunity for this customer?

    A. The customer wants to accelerate certain DB2 on zEnterprise queries.
    B. The customer wants to accelerate their DB2 on Power with AIX.
    C. The customer wants a stand-alone zBX with Power blades to free up floor space.
    D. The customer wants to move Linux virtual machines from the zEnterprise to a zBX so that the Linux applications can be closer to a Smart

  • Question 26:

    A customer recently ordered a z196 with a zBX.

    Which of the following is the best action a specialist could take to ensure the customer is satisfied with the new zBX?

    A. Review the hardware support process and the HMC documentation for the z196 CPC and the zBX
    B. Conduct and "Fit for Purpose Study"
    C. Conduct a z/VM Implementation Workshop
    D. Mentor the customer on installing PowerVM and VMware

  • Question 27:

    A customer is planning to upgrade from a z9 BC to z114. The customer used carry-forward for the FICON cards when purchasing the z9. The FICON cards are used for accessing DASD via a 1Gb SAN. Which of the following is correct?

    A. The customer can carry forward the FICON cards to the z114.
    B. The customer has to purchase current FICON8S adapters and upgrade the SAN to at least 8Gb.
    C. The customer has to purchase current FICON8S adapters and upgrade the SAN to at least 2Gb.
    D. The customer has to purchase current FICON8S adapters and upgrade the SAN to at least 4Gb.

  • Question 28:

    What is the minimum acceptable process or technique to estimate the capacity requirement for a replacement CPC?

    A. zCP3000
    B. zTPM
    C. LSPR capacity table
    D. zPCR

  • Question 29:

    A System z FTSS needs POWER blades configured for a zBX.

    Which of the following procedures should be used for this configuration?

    A. The z FTSS configures all components for the zBX using zManager configuration tool
    B. The z FTSS should provide the POWER blade requirements to the POWER team
    C. POWER team should configure the blade type normally acquired by the customer for a BladeCenter
    D. The customer should configure through the IBM Workload Estimator

  • Question 30:

    Which new z196 feature provides significant error detection and correction capabilities for bit, lane, DRAM, DIMM socket and memory channel failures?

    A. RAS
    B. RAID
    C. RACEv
    D. RAIM

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C4070-604 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.