C1000-031 Exam Details

  • Exam Code
    :C1000-031
  • Exam Name
    :IBM Power Systems Scale-Up Technical Sales
  • Certification
    :IBM Certifications
  • Vendor
    :IBM
  • Total Questions
    :101 Q&As
  • Last Updated
    :Jul 07, 2026

IBM C1000-031 Online Questions & Answers

  • Question 11:

    A customer is designing a highly scalable cloud management and deployment solution using PowerVM NovaLink.

    What does it mean when the HMC uses co-management mode?

    A. Dual HMCs will be required to manage the system.
    B. Novalink requires two connections to each PowerVM instance.
    C. Both FSPs must be connected to the HMC.
    D. Both the HMC and NovaLink can manage the system.

  • Question 12:

    What feature of PowerVM Enterprise Edition increases availability of production workloads?

    A. Virtual processors
    B. Active Memory Mirroring
    C. Live Partition Mobility
    D. Active Memory Deduplication

  • Question 13:

    Which open source technology forms the basis for PowerVC?

    A. Linux
    B. KVM
    C. Hadoop
    D. OpenStack

  • Question 14:

    A customer would like to add a second HMC to an environment which consists of multiple POWER8 and POWER9 processor-based systems. Which of the following is a requirement for both HMCs to be able to manage all the systems?

    A. Both HMCs must be at the same version of HMC Code.
    B. Both HMCs must be on the same HMC VLAN.
    C. All the POWER8 processor-based systems must be at the same firmware level.
    D. Each HMC must be on a dedicated HMC VLAN.

  • Question 15:

    What is the maximum memory capacity of a Power System E980?

    A. 32TB
    B. 64TB
    C. 128TB
    D. 192TB

  • Question 16:

    A customer would like to have the ability to dynamically adjust processor and memory allocations for a virtual machine. They are currently running VMware and Linux on x86.

    What is a benefit of using PowerVM over VMware on x86?

    A. Processors and memory can be dynamically added, although VM must be rebooted to remove memory.
    B. Processors and memory can be dynamically added.
    C. Processors and memory can only be dynamically removed but not dynamically added.
    D. Processors and memory can be dynamically added and removed.

  • Question 17:

    How is rack space reserved for cabling space when configuring Power System E980 servers?

    A. By designating 1U or 2U of space at either the top or bottom of the rack in the configuration.
    B. By using the supplied cable management arms that come with the server as standard.
    C. By requesting rack space during the pre-install Technical Delivery Assessment.
    D. By configuring extra blank rack panels.

  • Question 18:

    An IBM Business Partner is designing a solution with two POWER9 processor-based servers, an IBM V7000 storage, and IBM SAN switches. Which of the following will allow them to check the compatibility of software, device drivers, multipathing, and other technical specifications?

    A. IBM Facts and Features
    B. IBM System Storage Interoperation Center (SSIC)
    C. e-config
    D. Support web sites of the potential Original Equipment Manufacturers (OEM)

  • Question 19:

    A customer's Disaster Recovery plan requires daily backup tapes from their POWER9 processor-based server to be sent off-site. The POWER9 processor-based server is attached to an IBM Tape Library with LTO-7 tape drives and Storwize V7000 storage devices. The customer is concerned about the liability of sending sensitive data off premises.

    Which of the following solutions will satisfy the customer's concerns?

    A. Enable the optional Storwize encryption feature.
    B. Purchase the LTO Tape Encryption feature and Security Key Lifecycle Manager (SKLM)
    C. Purchase an IBM Cryptographic Co-Processor.
    D. Purchase IBM Multi-Cloud Data Encryption.

  • Question 20:

    To improve response times for an OLAP application, a POWER9 customer requires a SAN-attached storage solution with microsecond latency and highest density per rack.

    Which of the following supports these requirements?

    A. FlashSystem 900
    B. IBM ESS
    C. IBM Nutanix
    D. Storwize V7000

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C1000-031 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.