BICSI BICSI-RCDD Online Questions & Answers

  • Question 81:

    An unforeseen geopolitical risk impacts a program to establish a company's operations abroad. Stakeholders now want to establish a risk response team to define a mitigation plan. Ultimately what appeared to be a significant risk resulted in a negligible risk.

    What should the program manager recommend to stakeholders for future similar situations?

    A. Accept the risk
    B. Seek an expert opinion
    C. Establish an on-call risk response team
    D. Review the risk severity matrix

  • Question 82:

    An ICT distribution designer is coordinating with local agencies for an upcoming campus improvement project which could affect the design.

    Which two of the following listed items will MINIMIZE design changes once the project begins?

    (Choose two.)

    A. Identification and agreement of conduit pathway routes
    B. Hand off of documentation to project manager
    C. Identification of maintenance holes, hand holes locations
    D. Approval of budget by chief financial officer (CFO)
    E. Approval of permit by AHJ - local Fire Marshal

  • Question 83:

    Smaller buildings with a serving area larger than 1000 ft2 and less than 5000 ft2 may be served by:

    A. self-contained cabinets.
    B. wall cabinets.
    C. shallow rooms.
    D. enclosed cabinets.

  • Question 84:

    Which of the following should be used as a guideline for estimating space requirements of optical fiber and coaxial cable cross-connections in a TR?

    A. 3 sq. in. for each fiber pair to be patched or cross-connected.
    B. 2 sq. in. for each fiber pair to be patched or cross-connected.
    C. 4 sq. in. for each fiber pair to be patched or cross-connected.
    D. 1 sq. in. for each fiber pair to be patched or cross-connected.

  • Question 85:

    A global communications company's cloud-based platform will host its video network using both on - and off-shore learns. The program management office (PMO) assigns a program manager with little experience executing global initiatives.

    What should the program manager do to resolve competing resource needs within components that could impact the entire program's overall delivery date?

    A. Require project managers to perform resource levelling in their schedules to automatically take into account availability and dependencies tor key resources.
    B. Revisit assignments on a weekly basis to manually level resources thereby limiting burn-out and preventing underutilization
    C. Optimize integration of the component projects by working with the project managers to align resource skill sets and availability to the program
    D. Improve communications between the project managers to gain efficiencies in resource assignments

  • Question 86:

    In a PON deployment,

    which active device is installed at the work area?

    A. Wireless access point
    B. Optical amplifier
    C. Optical line terminal
    D. Optical network terminal
    E. Splitter

  • Question 87:

    For a backbone distribution system serving a usable floor space of 8,920 m2 (96,000 ft2), the MINIMUM slot area to be used for this back bone is

    A. 0.040 m2 (60 in2)
    B. 0.048 m2 (72 in2)
    C. 0.056 m2 (84 in2)
    D. 0.064 m2 (96 in2)

  • Question 88:

    Which of the following is the Standard for the Installation of Lightning Protection Systems?

    A. NFPA-780
    B. NFPA-70
    C. NFPA-72
    D. NFPA-75

  • Question 89:

    Which of the following are general power requirements for all TRs?

    A. Install a separate 120 volt duplex convenience outlet for tools and test sets etc.
    B. At least one outlet should be switched.
    C. Place outlets at 6 ft intervals around perimeter walls.
    D. Install a minimum of two dedicated non-switched 3-wire 120 volt 20 amp duplex outlets.
    E. Distribution panels that serve telecommunications equipment should be the same that serve lighting fixtures.
    F. Convenience outlets should be identified and marked.

  • Question 90:

    What would prevent a program manager from completing program closure once a program has been completed?

    A. Failure to update the financial management plan
    B. Failure to update the benefits register
    C. Incomplete realization of all program benefits
    D. Failure to obtain program steering committee approval

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.