  • Question 101:

    You have just finished a design calling for 15 telecommunications outlets. You received word that the owner has increased his requirements by 40%.

    What size commercial DD (distribution device) is required to accommodate the increase?

    A. 660 mm (26 in)
    B. 1015 mm (40 in)
    C. 1346 mm (53 in)
    D. 1676 mm (66 in)

  • Question 102:

    The project manager of project A develops a communications management plan.

    The project manager of project B is new and is uncertain how to develop appropriate communications for the company's staff What should the program manager do to ensure communications on the component projects are consistent?

    A. Request a more experienced project manager to work on project 6
    B. Create a program communications management plan across all component projects
    C. Direct all projects to use project A's communications management plan as a template
    D. Rework the communications management plans for all projects to be consistent

  • Question 103:

    An organization must accelerate a product to market.

    The program manager completes the preliminary program slaps and holds a kick-off meeting Project managers submit their preliminary schedules for review What should the program manager do next?

    A. Assign resources lo the schedule and report the revised delivery date to the project managers
    B. Work with the project managers to refine the project schedules and deliverables to align with the program milestones
    C. Revise the project schedules to meet the program schedule and communicate to stakeholders
    D. Integrate the project schedules into the program schedule and report the revised delivery date to the project managers

  • Question 104:

    A program manager is developing a program management plan by integrating the plans of constituent projects.

    During this effort, the program manager learns that a resource is critical to more than one component and there is a time overlap for their availability When creating the program resource management plan, what should the program manager do first?

    A. Ask the human resource manager to hire an additional resource
    B. Revise the plan to ensure the allocation of all needed resources
    C. Analyze resource capacity and capability with component protect managers
    D. Develop the program schedule in accordance with resource availability

  • Question 105:

    To encroach on navigable waterways contact

    which of the following?

    A. Department of Transportation in the state where the property is located.
    B. None of these.
    C. The engineering office for that government.
    D. U.S. Army Corps of Engineers.

  • Question 106:

    What would be the minimum length of casing to cross a single railroad track at 90 degrees?

    A. 15 feet.
    B. 50 feet.
    C. 35 fees.
    D. 25 feet.

  • Question 107:

    Which of the following is a consideration for lighting telecommunication spaces?

    A. To ensure worker safety within TEs. Light level requirements are higher tor these than other spaces
    B. The light fixtures within telecommunications spaces shall be fluorescent type fixtures.
    C. The electrical power for lighting shall be connected to the same electrical panel as the telecommunications equipment.
    D. The lighting layout shall be coordinated with the equipment and pathway locations

  • Question 108:

    Exhibit:

    In this future marina layout,

    what would be the pre-cabling guideline to follow for the terminal A?

    A. Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run service drop to each boat slip.
    B. Provide one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
    C. Pre-cable each boat slip during construction.
    D. For security, each run should be terminated in the patch panel/ cross-connect at the dockmaster or marina office.

  • Question 109:

    An underfloor preset insert must be used in a post-tensioned pour.

    A. True
    B. False

  • Question 110:

    A program sponsor is concerned about the status of high-priority risks and budget variances.

    The program manager should refer lo which of the following?

    A. Program status dashboard
    B. Program management plan
    C. Program performance report
    D. Program management information system (PMIS)

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.