  • Question 61:

    An ICT distribution designer is reviewing design documents with the owner to gam approval for an ER design.

    Which of the following information about the site shall be included?

    A. Sustainability requirements
    B. Suitability requirements
    C. Access and/or service provider requirements
    D. Designer requirements

  • Question 62:

    If there are existing copper aerial cables on a pole line, sag the optical fiber cable to the same sag as the other cables.

    A. False
    B. True

  • Question 63:

    What is the MINIMUM fire rating for telecommunications spaces walls and wall linings, if not specified otherwise by local Authority Having Jurisdiction (AHJ)?

    A. One hour
    B. Two hours
    C. Three hours
    D. No minimum requirement

  • Question 64:

    The program selection committee presents several programs for approval:

    Which program was selected based solely on a three-year return on investment?

    A. Program A
    B. Program B
    C. Program C
    D. Program D

  • Question 65:

    When designing horizontal pathways, the ICT distribution designer should consider the design's ability to (Select two options.)

    A. handle only the day one needs as the future is unknown.
    B. minimize occupant disruption when horizontal pathways are accessed.
    C. handle at least 3 different cabling media types.
    D. accommodate cabling changes
    E. accommodate at least 50 percent future growth

  • Question 66:

    What's the MINIMUM depth of a trench from top of the cable/conduit to final grade? (Select two options.)

    A. 305 mm(12 in)
    B. 610 mm (24 in)
    C. 914 mm (36 in)
    D. 1270 mm (50 in)
    E. Below the area's 50-year frost line

  • Question 67:

    Underground facilities are cables placed in subsurface conduits, using maintenance holes and or pull boxes.

    A. True
    B. False

  • Question 68:

    A program receives initial approval from the selection committee to proceed with the program development.

    What should the program manager do next"?

    A. Define the program architecture and assign the benefits realization to the component projects.
    B. Complete the program setup to establish a firm foundation of support and approval for the program
    C. Analyze lessons learned and historical information to validate the programs expected outcomes
    D. Continue to develop the high-level program road map

  • Question 69:

    An ER cannot be used as an entrance facility.

    A. True
    B. False

  • Question 70:

    How many storm loading areas are there in the contiguous United States?

    A. Five
    B. Six
    C. Four
    D. Three
    E. One
    F. Two

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.