BICSI BICSI-RCDD Online Questions & Answers

  • Question 31:

    As a general guideline in premises applications for backbone cabling, 62.5/125 or 50/125 micrometer multimode optical fiber is recommended for greater distances and higher data rates.

    A. True
    B. False

  • Question 32:

    While setting up a program's infrastructure and plan, a program management team develops documents and processes that provide commonality and consistency throughout the program's components.

    What should the team also prepare, if not already provided by the organization's assets?

    A. Breakdowns such as the program work breakdown structure (PWBS) component project milestones and budgets that transform top-level planning into fragments relevant to the components
    B. Industry standards that provide guidance to the component project managers on how to adapt their detailed planning to the program's master plan
    C. Documents that enable level-adequate aggregation and consolidation of component/program information and forecasting
    D. Files, filing structures, and templates for knowledge repositories that contain centrally stored and commonly maintained program data

  • Question 33:

    An ICT distribution designer installed a 50/1 ?5 mm/1300 nm fiber optic cable from Building A to identical Building B with a distance of 600 m (1968 ft) At Building

    B. the designer fusion splice this new cable to an existing identical 50/126 mm fiber optic cable that runs 800 m (2525 ft) to Building

    C. Both ends are terminated with SC connectors. What is the loss budget for the above fiber link?

    A. 2.95 dB
    B. 3.40dB
    C. 3.90 dB
    D. 4.35 dB

  • Question 34:

    A large international manufacturing company is centralizing its IT which is currently spread over 16 countries. The transition means physically regrouping the infrastructure and aligning processes and organizations.

    The high-level scope of this transformation encompasses three main areas.

    1. The technology area--assessing which technology/tooling should be retained for the target data center

    2. The policies and procedure area-aimed at establishing a common set of processes supporting the new way of delivering services

    3. The HR area-assuring the new organization best fits the diversity of the countries and functional domains, while offering equivalent compensations for comparable functions

    You have selected your team and you are preparing the business case to support 1) the team selections you made and 2) your recommendation to proceed to the program's next phase

    Which document should be present m your business case?

    A. A detailed plan showing dependencies among the constituent protects
    B. A comprehensive analysis of the different compensation packages offered in the 16 countries
    C. An inventory detailing all physical and logical components in place and the employees in scope
    D. A cost/benefit analysis of the different scenarios, presenting their respective contributions

  • Question 35:

    In what year was BICSI formally incorporated?

    A. 1977
    B. 1984
    C. 1967
    D. 1940

  • Question 36:

    In a budding with one join room for serving as the FR and EF and four dedicated TRs on the same floor a total of__________ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.

    A. 4
    B. 8
    C. 16
    D. 20

  • Question 37:

    Which of the following team members is responsible for ensuring compliance with me contract documents (CD)?

    A. Owner
    B. lCT Distribution Designer
    C. Architect
    D. Construction Manager (CM)

  • Question 38:

    For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a

    A. SoW.
    B. spare ad sheet
    C. worksheet
    D. database

  • Question 39:

    Power outlets should be place every 10 feet around the perimeter walls of the TR.

    A. True
    B. False

  • Question 40:

    FOTP is an acronym

    for which of the following?

    A. Fiber Optic Test Procedure.
    B. Fiber Outside Termination Point.
    C. Frequent Optical Transmission Problems.
    D. Fiber Optic Transition Point.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.