BICSI BICSI-RCDD Online Questions & Answers

  • Question 321:

    The CEC is revised every four years.

    A. True
    B. False

  • Question 322:

    Rolling objects create

    what type of load on an access flooring system?

    A. Dynamic
    B. Impact
    C. Static
    D. Physical
    E. Virtual

  • Question 323:

    SRB can be treated with household bleach.

    A. True
    B. False

  • Question 324:

    To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.

    A. Two
    B. Four
    C. Five
    D. Six
    E. Eight

  • Question 325:

    Which of the following is a common application for exothermic welding of earthing (grounding) and bonding conductors?

    A. Bonding to structural steel
    B. Locations requiring monthly maintenance
    C. Connections made to the TBB
    D. Cable to cable connections

  • Question 326:

    A program governance board mandates that phase gate reviews must be held so each component project can be reviewed and individually authorized to proceed to the next phase Tracking and reporting of actual benefits realized is one part of the review

    What is the other part of the review"?

    A. Tracking and reporting on benefits management plan
    B. Identifying factors Influencing delivery of benefits
    C. Demonstrating that other stage gate requirements have been met
    D. Gathering additional stakeholders' requirements

  • Question 327:

    For a six story building (plus a basement) each of the six floors has a useable area of =3716 m2 (40.000 ft2) There are two riser systems, each serving halt of the useable area on each Moor

    What are the sleeves quantity and configuration required from fifth floor to sixth floor?

    A. Two sleeves
    B. Three sleeves
    C. Four sleeves
    D. Five sleeves

  • Question 328:

    A utility company manages its capital improvement projects (CIP) using engineers, project managers, and program managers. A new sponsor from the utility company assesses the CIP and decides to reorganize it into a program. They invite seven companies to discuss their approach to monitor and control the program and its constituent protects.

    Where should the program manager incorporate this input?

    A. Program management plan
    B. Stakeholder register
    C. Vendor management matrix
    D. Program risk management plan

  • Question 329:

    An Ethernet passive optical network (EPON) uses an aggregation device called an optical line terminal (OLT). An OLT can support a MINIMUM of______subscribers per port using a passive optical splitter

    A. 8
    B. 16
    C. 32
    D. 64

  • Question 330:

    When designing cable tray pathways under an access floor,

    what is the MINIMUM free space that should exist between the top of the cable tray side rails and the underside of the stringers?

    A. 25 mm (1 in)
    B. 51 mm (2 in)
    C. 71 mm (3 in)
    D. 101.60 mm (4 in)

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.