  • Question 201:

    What is the MINIMUM lighting requirement for telecommunications spaces?

    A. 50 lux (4.6 foot-candles) of lighting in the horizontal plane and 20 lux (1.9 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
    B. 200 lux (18.6 foot-candles) of lighting in the horizontal plane and 500 lux (46 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
    C. 500 lux (46 foot-candles) of lighting in the horizontal plane and 200 lux (18.6 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor
    D. 500 lux (46 foot-candles) of lighting in the horizontal plane and 500 lux (46 foot-candles) of lighting in the vertical plane measured at 1 meter (3.28 feet) above the finished floor

  • Question 202:

    The ICT distribution designer is hired to design a Telecommunications Room on the third floor of a building. The size of the floor is 20 m by 26 m (92 x 85 It).

    What is to be the MINIMUM size of the TR?

    A. Shallow Room, no minimum room size
    B. =3 m (10 ft) by = 2.40 m (8 ft)
    C. =3 m (10 ft) by =2.74 m (9 ft)
    D. =3 m (10 ft) by =3.40 m (11 ft)

  • Question 203:

    A program manager has four projects pending approval Senior management asks the program manager to identity a project for potential elimination based on the return on investment. The program manager has the following information to guide and support the decision.

    Which project should the program manager select to be cancelled?

    A. Project A
    B. Project B
    C. Project C
    D. Project D

  • Question 204:

    As a project manager,

    what should the FINAL task be at of the end of each project?

    A. A costing and billing review
    B. Delivery of the final documentation
    C. A lessons learned meeting
    D. A sign off meeting with the owner

  • Question 205:

    One interior TTY must be provided at locations defined as public accommodations with ________ or more pay telephones.

    A. One
    B. Two
    C. Four
    D. Six
    E. Eight

  • Question 206:

    i program with six projects has been running for three years. The company's procurement and contracts department has compiled a qualified seller list.

    The program manager determines that one of the projects must be outsourced he program manager will use the qualified seller list to do which of the following?

    A. Plan a proposal evaluation system
    B. Prepare the program procurement management plan
    C. Perform the required program budget updates
    D. Issue requests for proposals

  • Question 207:

    Which of the following transmitter light sources has a MINIMUM bandwidth of 4700 MHz/km (EMB) at 850 nm">

    A. OM1 (62 50/125 multimode)
    B. OM2 (50/125 multimode)
    C. OM3 (50/125 laser optimized multimode)
    D. OM4 (50/125 laser optimized multimode)

  • Question 208:

    Which of the following is an address used to uniquely identify each device on a LAN with an address coded in the network interface card?

    A. MAC
    B. TCP
    C. IP
    D. Physical Layer

  • Question 209:

    AI the beginning of the second year of a five-year strategic cycle, the program management team attends a checkpoint session to review the state of the company's strategy During the previous year, the company needed to comply with new government regulations that impacted this strategy.

    Based on this information,

    what should the program manager do?

    A. Update the program management, benefits management and risk management plans, and modify priorities and inter dependencies
    B. Meet with stakeholders, and modify the program roadmap to comply with the new regulations and ensure strategic alignment
    C. Obtain stakeholder approval to stop or postpone programs that fail to comply with the new regulations, and modify the program roadmap
    D. Review resource capacity and capability, program priorities, and inter dependencies, and create a change request to modify the program roadmap to ensure strategic alignment

  • Question 210:

    A program manager prepares the program for review to secure funding by senior management.

    Which of the following must the program manager identify when creating the program charter?

    A. Milestone dates, budget, and staff details that support it
    B. Assumptions incorporated into the benefits management plan
    C. Process within the organization that will be needed to deliver the product
    D. Key decision makers or stakeholders in the program and their expectations and interests

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.