Avaya Avaya Others Certifications 75940X Questions & Answers

  • Question 21:

    When powering up the virtual machines, what is the first virtual machine that needs to be powered on?

    A. vCenter Server

    B. WebLM

    C. System Manager

    D. Communication Manager

  • Question 22:

    Which three are found in the E:\ ACP_SW_4.0 folder of the Management Server Console (MSC)? (Choose three.)

    A. Firmware for Extreme Networks VSP Switches

    B. Software and Patches for Avaya Orchestrator and Avaya Aura?applications

    C. Installation files for the vCenter client application

    D. Software and Patches for VMware ESXi and vCenter

    E. A copy of the Lifecycle workbook

  • Question 23:

    When used for an ACP 4200, which two features of the 48 inch Avaya branded enclosures are different from the 42 inch models? (Choose two.)

    A. More space for PDUs (up to 15000 Watts)

    B. More space for additional servers

    C. Higher operating temperature (up to 45 degrees Celsius)

    D. More space for fans and better cooling capacity (51,200 BTU)

    E. Use of vertical PDUs instead of horizontal

  • Question 24:

    Which application can a technician use to remotely connect to the Management Server Console on an ACP 4200?

    A. VNC

    B. Remote Desktop Connection

    C. PuTTY

    D. Team Viewer

  • Question 25:

    An engineering implementation team has been asked to install an ACP 4200.

    Which task related to the Avaya Orchestrator is completed during the installation by the implementation team?

    A. Deploy the Rack and Device Dashboards.

    B. Install Avaya Orchestrator.

    C. Run the ACP Configuration Wizard.

    D. Power on the Avaya Orchestrator virtual machine.

  • Question 26:

    Which three tasks must be completed in preparation of a site for an ACP 4200 installation? (Choose three.)

    A. Determine the list of Customer Administrators who will require login access to the ACP 4200.

    B. Install power connections for the ACP 4200.

    C. Plan the path from the delivery location to the permanent site.

    D. Determine a permanent location for the ACP 4200.

    E. Enable SNMP management on the network devices that will be connected to the ACP 4200.

  • Question 27:

    When preparing a site for an ACP 4200 installation, which task is optional?

    A. Identify potential obstacles, such as signs and fire extinguishers in the path from the delivery location to the permanent site.

    B. Plan the path from the delivery location to the permanent site.

    C. Ensure that a minimum of four people are available to move the ACP 4200 due to its size and weight.

    D. Ensure there is a room to maneuver the ACP 4200 around any tight corners in hallways.

  • Question 28:

    Aside from the difference in the depth of the enclosure, what other difference is there between the 48 Inch Model and 42 Inch Model of the ACP 4200 Avaya-branded Enclosure?

    A. There is no other difference between the 48 Inch Model and 42 Inch Model.

    B. The 48 Inch Model has a higher maximum wattage capacity compared to the 42 Inch Model.

    C. The 48 Inch Model has a higher maximum weight compared to the 42 Inch Model.

    D. The 48 Inch Model is only available in Grey while the 42 Inch Model is only available in Black.

  • Question 29:

    Which three tasks must be performed by the ACP 4200 implementation team at the customer site? (Choose three.)

    A. Connect the network switches to the customer network.

    B. Assign IP addresses to the existing Virtual Machines.

    C. Connect to the VMware vCenter Server Appliance and power up the virtual machines.

    D. Fill up the IP template.

    E. Install a ground connection for each enclosure.

  • Question 30:

    An installation engineer is installing the power connections to the ACP 4200.

    What must the installation engineer be aware of?

    A. Before connecting the power, the power switches of all components in the rack must be in the OFF position.

    B. Power cables must only access the rack from the top of the rack.

    C. Power connections must be within 10 feet (3 meters) of the rack.

    D. Power cables must only access the rack from the bottom of the rack.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Avaya exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 75940X exam preparations and Avaya certification application, do not hesitate to visit our Vcedump.com to find your solutions here.