You have a server named Server 1 that runs Windows Server 2016.
You plan to use Windows Server Backup to back up all of the data on Server l. You create a new volume on Server 1.
You need to ensure that the new volume can be used as a backup target. The backup target must support incremental backups.
Solution: You assign a drive letter to the volume, and you format the volume by using ex FAT.
Does this meet the goal?
A. YesYou have three Hyper-V hosts named Server1, Server2, and Server3 that run Windows Server 2016. The servers are nodes in a failover cluster. The failover cluster contains two virtual machines named VM1 and VM2. The roles for VM1 and VM2 have the following configurations.

All of the nodes in the failover cluster have sufficient resources to run VM1 and VM2 concurrently.
VM1 and VM2 fail over to Server3.
What is the state of each virtual machine after the failover?
A. Both VM1 and VM2 are stopped.HOTSPOT
Your network contains an Active Directory domain named contoso.com The domain contains a domain controller named Server1 and a member server named Server2. Server1 has the DNS Server role installed Server2 has IP Address Management lPAM installed The IPAM server retrieves zones from Server1 as shown in the following table.


Hot Area:

Note: This question is part of a series of questions that use the same similar answer choices. An answer choice may be correct for more than one question in the series. Each question is independent of the other questions in this series.
Information and details provided in a question apply only to that question.
You have an Active Directory domain that contains two Hyper-V servers named Server1 and Server2. Server1 has Windows Server 2016 installed. Server2 has Windows Server 2012 R2 installed.
Each Hyper-V server has three network cards. Each network card is connected to a different subnet. Server1 contains a dedicated migration network.
Server2 contains a virtual machine named VM5.
You plan to perform a live migration of VM5 to Server1.
You need to ensure that Server1 uses all available networks to perform the live migration of VM5.
What should you run1?
A. the Mount-VHD cmdletNote This question is part of a series of questions that use the same scenario. For your convenience, the scenario is repeated in each question. Each question presents a different goal and answer choices, but the text of the scenario is exactly the same in each question in this series.
Start of Repeated Scenario:
Your network contains an Active Directory domain named contoso.com The functional level of the forest and the domain is Windows Server 2008 R2 All servers in the domain run Windows Server 2016 Standard. The domain contains 300
client computers that run either Windows 8.1 or Windows 10.
The domain contains nine servers that are configured as shown in the following table.

The virtual machines are configured as follows:
Each virtual machine has one virtual network adapter
VM1 and VM2 are part of a Network Load Balancing (NIB) cluster.
All of the servers on the network can communicate with all of the virtual machines.
End of repeated Scenario.
On server4, you plan to provision a new volume that will be used to create large, fixed-size VHDX files. Which type of file system should you use the new volume to minimize the amount of time required to create the VHDX files?
A. ReFSYour network contains an Active Directory domain named contoso.com. The domain contains two servers named Server1 and Server2 that run Windows Server 2016. The servers have the same hardware configuration.
You need to asynchronously replicate volume F: from Server1 to Server2.
What should you do?
A. Run New-SRPartnership and specify the ReplicationMode parameter.Your network contains an Active Directory domain. The domain contains two domain controllers named DC1 and DC2. DC2 is a virtual machine that is hosted on a Hyper-V host named HyperV1. DC1 holds the PDC emulator operations
master role.
You need to create a new domain controller named DC3 by using domain controller cloning.
Which five actions should you perform in sequence before you can import the cloned virtual machine? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.
Select and Place:

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 70-740 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.