Refer to the exhibit.

Fiber links are provisioned directly between the spine and leaf switches in the given LAN topology A/30 prefix has been configured over each fiber link to provide underlay connectivity for a VXLAN network.
The network-engineering team must update the network configuration to provide the shortest possible convergence time if a fiber link is cut.
Which action must the team take to meet the requirement?
A. Configure the /30 links as OSPF point-to-point networksA customer is evaluating a new disaster-recovery solution for their SAN, which is used for noncritical CRM purposes.
The SAN is frequently backed up locally at the customer's existing single location, and several hours of data loss can be sustained.
The customer wants to retain complete control of the failover process to a separate physical location.
Which type of DR is most suitable for the customer?
A. cold standbyA Cisco engineer is discussing a data center design scenario that consists of 24 Cisco UCS B200M6 Wade servers. 2 Cisco UCS 6454 Fabric Interconnects, and 3 Cisco UCS 5108 server chassis In the proposed configuration, the server links, which are vNICs on the blades, are associated with a single uplink port Server-to-server Layer 2 traffic is locally switched, server-to-network traffic goes out on its pinned uplink port, and each server MAC address must be learned before traffic can be forwarded to it
Which feature stipulates that traffic is forwarded to a server only if it is received on a pinned uplink port for this server?
A. MAC address table visualizationA network architect is designing a storage network to connect to an existing IP network over 100G Ethernet ports for multiple hosts The architect decided to require iSCSI multipathmg to provide multiple routes between servers within the SAN and storage devices that reside within the IP network. Which requirement must be applied to the IP network switch that connects to the SAN environment where the hosts reside9
A. ECMP routes on the IP network to facilitate toad sharingA Cisco engineer is analyzing a customer environment where dozens of VMs are running on a physical server and UCS chassis are cascaded
The setup uses two ISLs in a port channel to the SAN switch (per fabric)
The oversubscription from VM to physical SAN port is often 20 (VMs/host) x 72 (9 UCS chassis cascaded = 72 hosts): 2 (ISLs from fabric interconnect to SAN switch port on the NPV core (NPIV enabled switch)
This results to 20 x 72 2 per single ISL = 720 VMs per ISL 20 (VMs per host) x 8 (hosts per chassis) x 9 (chassis per port channel to SAN switch) / 2 (ISLs per port channel) = 20 x 8 x 9 / 2 = 720 VMs per SAN F-port
What is the best way to resolve possible IOPS bottleneck?
A. Deploy a content delivery networkRefer to the exhibit.

An engineer must deploy NEW-VRF-001 in the data center. All hosts require full reachability with all other hosts, no matter on which pod the host deployment occurs.
Which set of commands must the engineer include in the deployment?
A. host-reachability protocol bgp advertise I2vpn evpnA Cisco engineer is using a PowerShell script to create a service profile template on Cisco UCS Manager.
After defining the server pools and other templates, the engineer must ensure that the hosts are visible lo the northbound SAN network and storage initiators.
Which configuration must be applied to enable this capability?
A. Get-UcsApplianceCloud | Get-UcsVlan -name AppIianceVlan | Add- UcsVlanMemberPort -Switchld A -Slotld 1 -Portld 15Refer to the exhibit.

An engineer working for a service provider with an employee ID:
4800:35-849 must perform the mapping of Fibre Channel LUN targets lo the indicated iSCSI virtual target.
Which configuration shows the requited mapping?
A. iscsi virtual-target name iqn.2021-07.com.cisco.target-1 pWWN 28:00:00:00:00:00:00:10 fc-lun 1 iscsi-lun 0 iscsi virtual-target name iqn.2021-07.com.cisco.target-2 pWWN 28:00:00:00:00:00:00:10 fc-lun 2 iscsi-lun 0 pWWN 28:00:00:00:00:00:00:10 fc-lun 0 iscsi-lun 1Refer to the exhibit.
[Exhibit missing]
A Cisco engineer is configuring a Cisco UCS integrated infrastructure for SAP HANA that consists of 8 x Cisco UCS B/C480-M5 servers for SAP HAN A and 4 x Cisco UCS C240-M5 C-Series rack mount servers for storage.
The rack servers are equipped with Cisco VIC 1225T.
The engineer plans to install RHEL8. but the boot process is interrupted at installation because the iSCSl LUNs are not recognized by the VIC adapter. After proper Investigation, the engineer concludes that the initiator and target
configuration that is programmed on the primary ISCSl VNIC to the operating system Is missing.
What is the reason for the issue?
A. The network interfaces are not configured.Refer to the exhibit

A Cisco engineer is configuring Cisco Nexus 7000 Series Switches.
To simplify initial configuration verification and vPC+/HSRP troubleshooting, the engineer configures the primary vPC+ peer device with the FHRP active router highest priority.
The primary FHRP device responds to ARP requests, even though the secondary vPC+ device also forwards the data traffic.
Which configuration enables the Layer 3 connectivity from each vPC* peer device?
A. Configure a VLAN network interlace for the same VLAN from both devices.Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Cisco exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 300-610 exam preparations and Cisco certification application, do not hesitate to visit our Vcedump.com to find your solutions here.