UIPATH-ADPV1 Exam Details

  • Exam Code
    :UIPATH-ADPV1
  • Exam Name
    :UiPath Automation Developer Professional v1.0 (UiADP)
  • Certification
    :UiPath Certifications
  • Vendor
    :UiPath
  • Total Questions
    :208 Q&As
  • Last Updated
    :May 30, 2026

UiPath UIPATH-ADPV1 Online Questions & Answers

  • Question 111:

    What is the recommended approach for handling tabular data when building a REFramework transactional project in UiPath?

    A. Utilize a DataTable variable to store and process the tabular data.
    B. Save the tabular data in multiple CSV files for easier manipulation.
    C. Use separate variables to store each column of the tabular data.
    D. Implement custom activities to handle the tabular data.

  • Question 112:

    Which of the following is a tag in a selector?

    A. id='selMonth'
    B. aaname='FirstName'
    D. class-down-chevron set-font'

  • Question 113:

    What is the default polling interval set for an event trigger?

    A. 1 minute
    B. 5 minutes
    C. 10 minutes
    D. 15 minutes

  • Question 114:

    A developer needs to use the REFramework in order to implement a linear process. Which value should be set to "out_Transactionltem" the first time when it enters the Get Transaction Data state?

    A. The process will not enter the Get Transaction Data state because a linear process is not transactional.
    B. It should be set to the next queue item in order to be, further on, processed.
    C. It should be set to Nothing because a linear process should not enter the second time in the Get Transaction Data state.
    D. It can be set to a static value and. in order to respect the UiPath best practices, this value should be taken from "Config.xlsx".

  • Question 115:

    A developer is using the REFramework template to automate a process. In "SetTransactionStatus" file, there is the following sequence of activities, where the last Log Message activity was added by the developer: The configuration for Add Log Fields and Remove Log Fields activities are shown below: Add transaction log fields (Success)

    Remove transaction log fields (Success)

    The developer runs the process and notices the argument values for the first transaction are:

    in_TransacationID = "07/18/2023 10:27:29" io_TransactionNumber = 1 in_TransactionField1 = "UI235-80" in_TransactionField2 = "Update Request"

    Which of the following Log Message Details will be displayed when executing the activity Log Message Completed for the first transaction, considering it is successful?

    A. Option A
    B. Option B
    C. Option C
    D. Option D

  • Question 116:

    Which of the following statements accurately describes the primary components of a State Machine in a workflow?

    A. A State Machine is composed of States, Triggers, and Loops.
    B. A State Machine comprises three main components: Sequences, Flowcharts, and Input/Output Arguments.
    C. A State Machine is made up of States, Transitions, Entry Actions, and Exit Actions.
    D. A State Machine consists of four primary components: States, Triggers, Transitions, and Actions.

  • Question 117:

    A developer intends to incorporate a Flow Switch activity within a Flowchart. What is a characteristic of this activity?

    A. The Flow Switch activity is designed solely for usage in sequence workflows.
    B. Two default cases can be assigned in the Default section.
    C. The default TypeArgument property for the Flow Switch activity is set to Int32.
    D. Default cases can be numbered.

  • Question 118:

    What does Application Exception describe?

    A. An error rooted in a technical issue, such as an application that is not responding.
    B. An error caused by using different data types than the expected ones in an application.
    C. An error that occurs when the application is running on unstable environment.
    D. An error rooted in the fact that certain data which the automation project depends on is incomplete or missing.

  • Question 119:

    How do you subtract a specific TimeSpan from "Today" in VB.NET?

    A. DateTime.SubtractSpanFrom(Today, TimeSpan)
    B. DateTime.Now - TimeSpan
    C. Today.SubtractUsingDate(-TimeSpan)
    D. Today.Subtract(TimeSpan)

  • Question 120:

    A developer has designed a Performer process using the REFramework template in UiPath Studio. The process is published to an Orchestrator folder named "FolderA" and a job is created in Orchestrator from the package.

    The value of the OrchestratorQueueName setting in "Config.xlsx" is "QueueA" and the value of OrchestratorQueueFolder is "FolderA".

    The developer runs the job from Orchestrator with the following argument values:

    in_OrchestratorQueueName = "QueueB"

    in_OrchestratorOueueFolder = empty value

    Which queue will be consumed by the robot?

    A. OueueA from FolderA.
    B. QueueA from Shared.
    C. QueueB from FolderA.
    D. QueueB from Shared.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only UiPath exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your UIPATH-ADPV1 exam preparations and UiPath certification application, do not hesitate to visit our Vcedump.com to find your solutions here.