A technician is assigned a task to configure a new server with six hard drives. The senior administrator requested the technician utilize the drives for maximum fault tolerance. Which of the following RAID configurations should the technician use?
A. RAID 3An office in another location with hardware and equipment with replicated data is called a:
A. warm site.A technician performs monthly backups on a file server to a NAS device that can hold 1TB of data. The size of the monthly backups has been as follows: Month 1 = 50GB Month 2 = 65GB Month 3 = 80GB Starting with Month 1, based on the current rate of growth, in how many months will the NAS run out of available storage space?
A. 4An administrator is installing a server to be used to dynamically assign IP addresses to the network devices. Which of the following server roles must be used?
A. RASA syslog server is configured to use UDP port 514. The administrator uses Telnet to check port 514 against the syslog server. However, the syslog server is not responding. Which of the following is the MOST likely reason why the syslog server is not responding?
A. The syslog server is down.A server technician is attempting to find a server in the datacenter and only has the server's name. The technician does not have access to log in to the server and does not know where the server is located. Which of the following items would be MOST useful to inventory to aid in future server identification? (Choose two.)
A. Server makeAn administrator is upgrading the backup server from a single tape drive to a SCSI tape library.
The library has been unpackaged, mounted, and the library drivers installed. Which of the following items should the administrator have to connect the device to the backup server?
A. SCSI cableTwo new applications have been added to a working server. The server response is now very slow. An appropriate plan of action is to:
A. uninstall each server application and reinstall the two new applications.A server administrator is selecting cable for a 10GBASE-T server connection. If the server is 246ft (75m) from the switch, which of the following cable types should the administrator choose?
A. Cat 5The systems administrator is configuring a new iSCSI storage, which will be presented to several servers. Which of the following should the administrator use to present a LUN to a server?
A. MaskNowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only CompTIA exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your SK0-004 exam preparations and CompTIA certification application, do not hesitate to visit our Vcedump.com to find your solutions here.