  • Question 41:

    Which concept represents the time between the completion of two discrete units of production in Microsoft Dynamics AX 2012?

    A. cycle
    B. takt
    C. production flow
    D. Value Stream

  • Question 42:

    When creating an event Kanban, which setting links the Kanban rule to the production flow version?

    A. Last plan activity
    B. Product selection
    C. First plan activity
    D. Replenishment strategy

  • Question 43:

    Which inventory model must you use for all production flow-related products other than withdrawal Kanbans?

    A. Weighted avg.
    B. LIFO
    C. FIFO
    D. standard cost

  • Question 44:

    What is a valid exception to the standard cost requirement in Microsoft Dynamics AX 2012?

    A. a manufacturing Kanban with Update on hand on pick and Update on hand on receipt both set to Yes
    B. a manufacturing Kanban with Update on hand on pick and Update on hand on receipt both set to No.
    C. a withdrawal Kanban with Update on hand on pick and Update on hand on receipt both set to No.
    D. a withdrawal Kanban with Update on hand on pick and Update on hand on receipt both set to Yes.

  • Question 45:

    Which statement is true when Include safety stock is selected in a Kanban quantity calculation policy?

    A. The safety factor is excluded.
    B. a Kanban simple formula is created.
    C. A service level is required.
    D. Demand during lead time is considered constant.

  • Question 46:

    Which of the following are Kanban types in Microsoft Dynamics AX 2012? (Each correct answer presents a complete solution. Choose two.)

    A. Fixed Quantity
    B. Manufacturing
    C. Withdrawal
    D. scheduled

  • Question 47:

    At what level is the standard cost maintained for products that are included in a production flow?

    A. item model group level
    B. item group level
    C. item number level
    D. site level

  • Question 48:

    Which event Kanban requires the Pegging event processing batch process to create Kanbans?

    A. stock replenishment event
    B. sales line event
    C. BOM line event
    D. Kanban line event

  • Question 49:

    What is the inventory transaction status for transactions used in the calculation of production variances from standard cost?

    A. Picked
    B. Deducted
    C. Physically updated
    D. Financially updated

  • Question 50:

    An inventory controlled withdrawal Kanban is posted between two sites in the same legal entity. Which cost is used to post transactions in the receiving organization?

    A. last cost for the receiving organization
    B. standard cost for the receiving organization
    C. last cost for the shipping organization
    D. standard cost for the shipping organization

Related Exams:

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB6-884 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.