  • Question 101:

    Which document establishes procedures for evaluating and addressing indoor air quality complaints under Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?

    A. Basis of Design (BOD)
    B. Indoor Air Quality Assessment Report
    C. Indoor Environmental Quality Management Plan
    D. Commissioning (Cx) Plan

  • Question 102:

    The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit, Light Pollution Reduction. Which interpretations must be used when attempting this credit?

    A. Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published after the project's registration date that the project thinks is relevant
    B. Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published on the project's registration date that the project thinks is relevant
    C. Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published before the project's registration date that applies to the project's rating system
    D. Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published before the project's registration date that applies to the project's rating system

  • Question 103:

    Which of the following prerequisites or credits has a minimum occupancy requirement?

    A. Indoor Environmental Quality Credit, Daylight and Views
    B. Water Efficiency Prerequisite, Indoor Water Use Reduction
    C. Energy and Atmosphere Prerequisite, Minimum Energy Performance
    D. Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance

  • Question 104:

    What requirement must be met when creating a demand response program that satisfies Energy and Atmosphere Credit, Demand Response?

    A. Demonstrate a load shift reduction of 5% in the building
    B. Permanently reduce the energy consumption in the building by 5%
    C. Have the building management sign a two-year demand response enrollment
    D. Create a comprehensive plan for meeting the contractual commitment during a demand response event

  • Question 105:

    Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources Credit, Solid Waste Management - Ongoing?

    A. Office chairs
    B. Mercury-containing lamps
    C. Shelving units
    D. Toner cartridges

  • Question 106:

    In which of the following ways can a campus project using a Group Approach comply with Water Efficiency Prerequisite, Building-Level Water Metering?

    A. Meter water use for each building separately; meter outdoor water use for the associated grounds
    B. Meter water use for the entire campus (buildings and the associated grounds) using a single meter
    C. Meter water use for all buildings aggregately with a single meter; outdoor water use for the associated grounds does not need to be metered
    D. Meter water use for all buildings aggregately with a single meter; meter outdoor water use for the associated grounds

  • Question 107:

    The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

    A. Install a vegetated roof system
    B. Convert lawn areas to native plants
    C. Mitigate the vegetated area off-site through a land trust
    D. Convert the paved areas of the site to pervious pavement

  • Question 108:

    Which strategy best supports continuous improvement after achieving LEED O+M certification?

    A. One-time performance testing
    B. Ongoing performance tracking and benchmarking
    C. Replacing all building systems
    D. Eliminating occupant feedback

  • Question 109:

    When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?

    A. 10%
    B. 20%
    C. 30%
    D. 40%

  • Question 110:

    A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

    A. September 30th
    B. October 30th
    C. November 30th
    D. December 30th

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only USGBC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your LEED-AP-O+M exam preparations and USGBC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.