  • Question 121:

    Contingency Tables are used to perform which of these functions?

    A. Illustrate one-tail proportions
    B. Analyze the "what if" scenario
    C. Contrast the Outliers under the tail
    D. Compare more than two sample proportions with each other

  • Question 122:

    Which statement(s) describe an undesirable situation when implementing SPC?

    A. The lower Control Limit for the R chart is equal to zero
    B. Attempt to use SPC for tracking transaction times at a warehouse
    C. A process is in Statistical Control before implementation of SPC
    D. The Control Limits are wider than the customer specification limits

  • Question 123:

    The reported Cpk for a process with an average of 94 units, a spread of 22 units and upper and lower specification limits of 125 and 80 units would be?

    A. 0.64
    B. 1.27
    C. 1.84
    D. 2.12

  • Question 124:

    Lean focuses on the sequence of activities and work required to produce a product or a service. This flow is called a ___________________.

    A. Value-add Flow
    B. Production Map
    C. Value Stream
    D. Operating Procedure

  • Question 125:

    After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?

    A. Moving Average Chart
    B. Multi-Vari Chart
    C. X bar Chart
    D. Pareto Chart

  • Question 126:

    The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which of these? (Note: There are 4 correct answers).

    A. Process control teams should not control a process based on SLs
    B. Displaying the SLs on a Control Chart sends a wrong signal toward process control
    C. Marking the SLs on a Control Chart is against the principle of charting
    D. By marking the SLs, one can confuse the operator as to what limits are critical
    E. By using mere Control Limits the process only needs to be in Statistical Control

  • Question 127:

    Inferential Statistics is largely about Significance. There are both Practical and _______________ Significance to consider during an analysis of data in a Lean Six Sigma project.

    A. Problematic
    B. Impractical
    C. Usable
    D. Statistical

  • Question 128:

    To create standardization of financial benefit calculations project savings are typically based on savings over what period of time?

    A. 6 months
    B. 12 months
    C. 24 months
    D. The remainder of the calendar year
    E. The remainder of the fiscal year

  • Question 129:

    A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.

    A. True
    B. False

  • Question 130:

    The acronym for the defined approach taken by Lean Six Sigma to solve significant challenges related to a process is which of these?

    A. DOE
    B. DMAIC
    C. SIPOC
    D. FMEA

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IASSC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ICGB exam preparations and IASSC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.