ICBB Exam Details

  • Exam Code
    :ICBB
  • Exam Name
    :IASSC Certified - Lean Six Sigma Black Belt
  • Certification
    :IASSC Certifications
  • Vendor
    :IASSC
  • Total Questions
    :424 Q&As
  • Last Updated
    :Jul 11, 2026

IASSC ICBB Online Questions & Answers

  • Question 211:

    To properly analyze the variables impacting the output of a process we need to collect data that represents at least 80% of the variation in the process and assure ourselves we are collecting data from all three types of variation which are _______________.

    A. Within, Between and Temporal
    B. Within, Between and Temporary
    C. Without, Above and Below
    D. Induced, Natural and Unavoidable

  • Question 212:

    ________________ creates fool proof method so that normal and abnormally are easily visualized in workspace.

    A. Selketsu
    B. Shitsuke
    C. Seiri
    D. Seiso

  • Question 213:

    A Belt has determined that the inventory of repair parts at a rework station can be reduced by 45%.

    According to Cost of Poor Quality (COPQ) definitions inventory reduction would be considered _______________.

    A. Soft Savings
    B. COPQ efficiency
    C. Median Savings
    D. Hard Savings

  • Question 214:

    A fundamental rule is that both Standard Deviation and Variance can be added.

    A. True
    B. False

  • Question 215:

    Fractional Factorial designs are used to reduce the time and cost of experiments because the ____________ has been lowered.

    A. Number of data measurement points
    B. Number of runs
    C. People involved
    D. Output summary

  • Question 216:

    Which Element of Waste best describes "the unnecessary movement of materials and goods"?

    A. Overprocessing
    B. Inventory
    C. Motion
    D. Conveyance

  • Question 217:

    Who developed the 5Whys method?

    A. Sakichi Toyoda
    B. Kaoru Ishikawa
    C. Shigeo Shingo
    D. Philip Crosby

  • Question 218:

    Which of these are examples of business metrics or Key Performance Indicators commonly referred to as KPI's?

    A. Cycle Time
    B. Defects
    C. No. of Units Reworked
    D. Labor Hours
    E. All of these answers are correct

  • Question 219:

    Which statement(s) are correct about the Factorial Plot shown here? (Note: There are 3 correct answers).

    A. When the cutting speed increased from low to high level, the tool age increases
    B. The coefficient of the metal hardness is positively related to the output of tool age
    C. The coded coefficient is lower for cutting speed than the cutting angle related to the output of tool age
    D. These plots prove a statistically significance factor with 95% confidence
    E. These plots are an example of interaction plots

  • Question 220:

    The Japanese born function of a Kanban event utilizes a specific, step-by-step approach meant to bring about major changes to a process.

    A. True
    B. False

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IASSC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ICBB exam preparations and IASSC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.