Exam Details

  • Exam Code
    :IASSC-ICBB
  • Exam Name
    :IASSC Certified Lean Six Sigma Black Belt
  • Certification
    :Lean Six Sigma Black Belt ICBB
  • Vendor
    :IASSC
  • Total Questions
    :305 Q&As
  • Last Updated
    :Apr 27, 2024

IASSC Lean Six Sigma Black Belt ICBB IASSC-ICBB Questions & Answers

  • Question 1:

    The Waste of Overproduction is defined as ______________________.

    A. The unnecessary movement of people and equipment

    B. The liability of materials that are bought, invested in and not immediately sold or used

    C. Producing more than the next step needs or more than the customer buys

    D. The extra movement of material

  • Question 2:

    One of the methods of testing a Measurement System is to have at least two people take multiple readings from the same instrument and of the same sample set to judge the Repeatability and Reproducibly. This approach is called a ______________ study.

    A. Correlation Analysis

    B. Gage R and R

    C. Bimodal

    D. Dual Attribute

  • Question 3:

    The Lean toolbox includes all of these items except ________________.

    A. Mistake Proofing

    B. Visual Factory

    C. Design of Experiments

    D. Inventory Management

  • Question 4:

    Which statement(s) are correct about the Regression shown here? (Note: There are 2 correct answers).

    A. The dependent variable is the outside temperature

    B. The relationship between outside temperature and number of customers per hour is a Linear Regression

    C. The dashed lines indicate with 95% confidence where all of the process data should fall between

    D. The dashed lines indicate with 95% confidence the estimate for the Quadratic Regression Line

    E. The predicted number of customers per hour is close to 5 if the outside temperature is 10 deg C

  • Question 5:

    Common and ______________ Cause Variation are the focus of Statistical Process Control.

    A. Uncommon

    B. Ordinary

    C. Special

    D. Selective

  • Question 6:

    Which of these is not a primary cause for Non-normal Data?

    A. Skewness

    B. Mixed Distributions

    C. Kurtosis

    D. Formulosis

    E. Granularity

  • Question 7:

    Use this data to calculate the Z score. Average oF. 65, Standard Deviation: 3, Upper Spec Limit: 72

    A. 0.27

    B. 1.5

    C. 2.33

    D. 4.12

  • Question 8:

    The _____________ Distribution would be the most desirable for modeling the number of stitch defects in a portion of fabric.

    A. Exponential

    B. Extended

    C. Poisson

    D. Weibull

  • Question 9:

    Which of these graphical presentations displays the values of each individual reading?

    A. Histogram

    B. Box Plot

    C. Stem and Leaf Plot

    D. X-Y Diagram

  • Question 10:

    The _______ is the most frequently occurring value in a distribution of data.

    A. Median

    B. Mean

    C. Mode

    D. Center Point

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IASSC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your IASSC-ICBB exam preparations and IASSC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.