A network architect plans to propose a virtual Mobility Master (VMM) for a new solution. The solution will support up to 4,800 wireless client devices and include: two Virtual Mobility Controllers (VMCs) in a cluster 180 APs
Which licenses should the architect propose?
A. 1 MM-VA-500; 2 MC-VA-250; 540 Enterprise licensesRefer to the exhibit.

A company needs a new wireless solution for its large campus with multiple buildings. The campus has 8,000 users, and the company also has 1000 users who use VIA concurrently. The customer requires full redundancy for the Mobility
Controllers (MC), including seamless roaming and stateful failover for the main site.
Buildings are close enough together for users to roam between them. The exhibit shows the existing wired network.
The architect plans to propose:
500 APs (100 each in Building 1 and 2, 200 each in Buildings 3 and 4).
two 7030 MCs
two 7220 MCs
one MM appliance
The exhibit shows the existing wired network at the main site.
Where should the architect plan to connect the MCs? (Potential locations are numbered in the exhibit.)
A. two 7030 MCs at 6; two 7220 MCs at 5Refer to the exhibits.
Exhibit 1. Existing wiring plan:

Exhibit 2. Current proposal:

A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building writing plan is shown in Exhibit 1. The customer will not consider any cable upgrades
at this point. The current proposal is shown in Exhibit 2.
Which correction must architect make to the proposal to meet the customer requirements?
A. Change the SR transceivers for each link between the writing closet switches and the network core to LRM transceivers.
A stadium wants to deploy location-based services, including blue-dot wayfinding over a 200,000 square foot (18,580 sq. m) area. The customer also wants to enable targeted notifications when guests walk past particular areas. The
customer has selected a 1 year subscription.
The exhibit shows the BOM that the architect created in Iris.
Which correction should the architect make?
A. Add another campaign subscriptionRefer to the exhibit.

A customer needs a network upgrade. The customer has these availability requirements for wireless access:
One MC and one core switch can fail with immediate, stateful failover for client connections.
Network upgrades can occur without the requirement of a maintenance window.
The exhibit shows the architecture plan.
Which technologies should the architect recommend?
A. Clustering on MCs and VRRP on Core switchesA customer has critical wired endpoints and wants to minimize the chances they will lose their connection to the network. These endpoints are dual-homed, each with two Ethernet connections that are in a link aggregation. The architect plans to deploy two 5406R switches in the closet.
What else should the architect specify in the plan?
A. The 5406R switches are in a VSF fabric; each switch has redundant power supplies, but not redundant management modules.A hospital needs a wireless solution which will provide guest access for patients and visitors, as well as for medical staff. In addition to laptops and tablets, staff have wireless voice communicator devices. Some medical equipment also connects wirelessly.
How can the network architect help to ensure that patient and visitor internet use does not interfere with more vital hospital applications?
A. Deploy IntroSpect to monitor patient and visitor traffic.Refer to the exhibit.


A customer needs a wired network upgrade and has complained about performance issues. The architect has collected information about traffic flow on several switch ports in different locations across the network, and the results are shown in the exhibit. Each of these ports is a 1Gbps port.
What can the architect conclude?
A. None of these ports show any periods of congestion.What is one reason that an architect might choose to use pico-cell coverage rather than overhead in a stadium?
A. to avoid major rewiring and construction concernsWhat is one reason to deploy an Aruba 8320 switch when compared to an Aruba 5400R switch?
A. to support cloud-based management and guest services through Aruba Central integrationNowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE6-A49 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.