HOTSPOT
Your customer has asked you to design a new platform to support their existing VMware cluster. The current environment runs their business applications along with several customer facing applications that are critical to the business. The current platform is two aged C7000 blade chassis with 16 blades in total connected via Fibre Channel to an HPE 3PAR storage array with 230TB of usable capacity. They are using Micro Focus Data Protector and tape for backup.
They are looking to upgrade the environment and improve their recovery times while reducing the management overhead.
Which server, storage, and data protection strategy meet all the customer requirements?

DRAG DROP
Match the solution from left to right the benefits.
Select and Place:

Which question can help you uncover a customer's desired business outcomes?
A. Which areas of your business are over performing and underperforming?You have designed an HPE Synergy solution for a customer site. The customer wants to use this solution design as a blueprint to implement the same solution in 200 locations. They want to minimize cost for installation and configuration and therefore plan to order everything Factory pre-installed and pre-configured.
Which HPE tool can you use to document the customer requirements and attach them to the order?
A. HPE SmartCIDYour customer needs the BTU rating for the complete rack level solution you have proposed to ensure it fits their thermal requirements. Which tools can provide you with this data? (Choose two.)
A. Power AdvisorYour customer needs assistance updating their database infrastructure with a modern solution that will grow with their needs and free up their IT staff to focus on value added activities. Which of the following benefits would the customer receive by choosing HPE GreenLake for database?
A. Cost savings with a community cloud operating model that supports sharing resources with other tenants.Your customer needs a compute solution. Their aging data center can only supply 5kW per rack, which is below the 15kW required for your planned solution. Which change could you recommend to satisfy the requirement while maintaining the planned solution's level of performance? (Choose two.)
A. Design the solution with non-redundant power supplies.When should a customer be offered an HPE GreenLake Cloud Service trial?
A. When the customer wants to evaluate a high-performance, large-scale power-user VDI cluster in the public cloud.Your customer is considering a new HPE Alletra 9060 to service their mission critical database workloads.
Their CFO is concerned with the cost of the unused excess storage capacity that will service unforeseen future growth.
What business values does HPE GreenLake for Block Storage provide that could alleviate this concern?
A. It offers CapEx purchases so the client can depreciate the storage assets.DRAG DROP Match the Terms left to right
Select and Place:

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE0-V27 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.