HP0-M101 Exam Details

  • Exam Code
    :HP0-M101
  • Exam Name
    :HP Application Lifecycle Management 12.x Software
  • Certification
    :HP Certifications
  • Vendor
    :HP
  • Total Questions
    :75 Q&As
  • Last Updated
    :Jul 11, 2026

HP HP0-M101 Online Questions & Answers

  • Question 31:

    How does the HP ALM Synchronizer operate?

    A. Through scheduled API calls
    B. Through synchronization links that are established between end-points
    C. Through cron jobs doing command line calls to the backend
    D. Through data mapping that occurs directly between databases

  • Question 32:

    What happens when an HP ALM project administrator saves a customization change as a Major Change rather than a Minor Change?

    A. The customization loads when the session expires and the user reconnects.
    B. The customization loads after the ALM server is restarted.
    C. The customization is added to the parent project template.
    D. The customization loads when the user changes screens in ALM.

  • Question 33:

    Converge Progress and Outstanding Defects are two graphs for tracking the progress and quality of your release.

    Which entities must be assigned to the release and cycle for these graphs to provide the complete information for your release? (Select Three)

    A. Requirements
    B. Test Sets
    C. Resources
    D. Components
    E. Defects
    F. Tests

  • Question 34:

    What happens when all licenses for a specific HP ALM module are currently in use and an additional user tries to access that module?

    A. ALM allows the user read-only access. Once a license is released, the user will be informed that write privileges nave been granted.
    B. ALM allows timesharing-based access. All users can access the module for a fixed time by using write privileges.
    C. ALM uses a fixed seat model. What happens depends on whether the user is accessing ALM from a computer that is registered as licensed.
    D. ALM uses a concurrency model. The user will be declined access and receive a message indicating such.

  • Question 35:

    What is one recommended way to start and stop the HP ALM services on the server on a Windows platform?

    A. In me system tray, right-click the ALM icon, and select Start Application Lifecycle Management or Stop Application Lifecycle Management.
    B. Log on to me application server JMX console. Look for typeServer under the appserver.system domain, and invoke the start or the shutdown operation.
    C. Log on to the ALM Site Administration click the Servers tab. and se.ect Start Application Lifecycle Management or Stop Application Lifecycle Management.
    D. Execute the run script or the shutdown script from the bin directory inside the main application server directory.

  • Question 36:

    DRAG DROP

    Place the steps in sequence. Refer to the Exhibit.

    Match the phase of the Application Life cycle Management roadmap with the appropriate number in the exhibit.

    Select and Place:

  • Question 37:

    DRAG DROP

    Put the following steps in the correct sequence to generate a Business Views Excel Report in Excel.

    Select and Place:

  • Question 38:

    How can you rename the Defects module for a specific project or template project only?

    A. Edit the REPLACE_TITLE Site Configuration parameter.
    B. Run the replace_tit1e.bat - command from the command line.
    C. Execute an SQL INSERT INTO statement against the project database.
    D. Add an entry to the dbid xml file.

  • Question 39:

    Wn.ch options can be used in the process or submitting defects from HP Sprinter to HP mm? (Select two)

    A. Smart Identification
    B. Insight Defects Identification
    C. Defect Reminder
    D. Defect Checking
    E. Smart Defect

  • Question 40:

    What does HP Sprinter's Storyboard feature do?

    A. Provides a movie editing toolbox for extracting, annotating, and assembling a sequence of screen captures after a test run
    B. Enhances the test with screen captures of the application under test, taken during the test run
    C. Enables testers to automatically design tests by capturing, annotating, and assembling a sequence of screen captures of the application under test
    D. Enables testers to view a guiding sequence of annotated screen captures during their test run via the storyboard sidebar

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HP0-M101 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.