You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
A. Generation of the new ABAP loads in phase RUN_SGEN_GENER8The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
A. Check the most recent entries shown in file sapevt.trcDuring an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
A. Execution of SPAU modification adjustmentWhen using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
A. Parameter file SAPup_add.parWhich are valid options to check the progress of the database migration in a Microsoft Windows environment?
There are 2 correct answers to this question.
Response:
A. Check the "Charts Control Center" in the SUM UIIn which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)? There are 2 correct answers to this question.
A. During downtimeYou are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
A. Specify the business functions that need to be switched on during the prepare part of SUM.You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:
A. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
A. Upgrading to SAP ECC 6.08 without using DMOWhich of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
A. SAP S/4HANA conversion including DMONowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your E_S4HCON2022 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.