  • Question 421:

    An SKU costing $10 is ordered in quantities of 500 units, annual demand is 5200 units, carrying costs are 20%, and the cost of placing an order is $50. Calculate annual inventory carrying cost

    A. $500
    B. $550
    C. $450
    D. $400

  • Question 422:

    The length of time from when material enters a production facility until it exists, this is known as:

    A. throughput time
    B. workforce time
    C. creation time
    D. assembly time

  • Question 423:

    The bill of material shows

    A. The components that go into making the parent
    B. The steps or process used to make the parent or the components
    C. Both A and B
    D. None of the above

  • Question 424:

    A work center is to process 150 units of gear shaft SG 123 on work order 333.the setup time is 1.5 hours, and the run time is 0.2 hours per piece. What is the standard time needed or run the order?

    A. 31.5 standard hours
    B. 30 standard hours
    C. 29.5 standard hours
    D. 28 standard hours

  • Question 425:

    The carrying cost is usually defined as a percentage of the dollar value of inventory per unit of time.

    A. True
    B. False

  • Question 426:

    A routing file should exist for every component manufactured and contain which of the following information?

    A. Work centers to be used
    B. Tooling needed at each operation
    C. Standard times
    D. All of the above

  • Question 427:

    Capacity needs to be measured on following levels EXCEPT:

    A. Machine or individual
    B. Work center
    C. Plant, which can be considered as a group of different work centers
    D. None of these

  • Question 428:

    A company wants to minimize the cost of manufacture and also be flexible enough to adapt to changing needs. Changes to production schedules can result in the following EXCEPT:

    A. Cost increases due to rerouting, rescheduling, extra setups, expediting, and buildup of work-in- process inventory
    B. Decreased customer service. A change in quantity of delivery can disrupt the schedule of other orders
    C. Loss of credibility for the MPS and the planning process
    D. Process create more scraps than needed than needed

  • Question 429:

    The inputs needed for a capacity requirement plan are open shop orders, planned order releases, routings, time standards and work center capacities, this all information can be obtained from:

    A. Open order file
    B. Material Requirements Plan
    C. Routing file
    D. All of the above

  • Question 430:

    XYZ Company is pursuing improved quality levels. Which of the following actions would produce the best results for XYZ?

    A. Hire additional inspectors
    B. tighten tolerances
    C. adopt a quality first slogan
    D. reduce process variability

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only APICS exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CPIM-MPR exam preparations and APICS certification application, do not hesitate to visit our Vcedump.com to find your solutions here.