There are following reasons of using sample inspections:
A. Testing the product is destructive
B. There is not enough to give 100% inspection to a batch of product
C. It is too expensive to test the entire batch and human errors is to be estimated as high as 20%
D. All of these
1.
Pareto charts
2.
Check sheets
3.
Process flowcharts
4.
Sactterplots
5.
Cause and effect diagram These are the:
A. Quality control tools
B. Control charts
C. demand measurements
D. None of these
1.
High quality level
2.
High flexibility to change such things as volume, specifications, and delivery
3.
High service level
4.
Short lead times
5.
Low variability in meeting targets
6.
Low cost
These are general requirements of:
A. Suppliers
B. Customers
C. All the supply chain agents
D. Sub-contractors
Basic concepts in TQM:
A. A committed and involved management
B. Focus on the customer
C. Involvement of the total workforce
D. All of these
Poke-Yoke (Fail Safe) tries to change either the process or its resources, thus eliminating the need to rely on human experience and knowledge. Examples include:
A. Use color-coded parts
B. Put a template over an assembled component to show operators where specific parts go
C. Both of these
D. None of these
Toyota has designed seven important sources of waste in manufacturing. The first four relate to the design of the manufacturing system and the last there to the operation and management of the system. Which one of the following is NOT out of those sources of waste?
A. Overproductions
B. Bottlenecks
C. Movement
D. Product Defects
If the range and variety of product are large:
A. Production runs will be short
B. Machines must be changed over frequently
C. Little opportunity to use the specialized machinery and fixtures
D. All of these
A process costs $200 to set up. The run time is 5 minutes per piece and the run cost is $30 per hour. Determine total cost and unit cost for a lot of 500.
A. Total Cost: $1450.00 and Unit cost: $2.90
B. Total Cost: $1400.00 and Unit cost: $2.80
C. Total Cost: $1455.00 and Unit cost: $2.90
D. Total Cost: $1440.00 and Unit cost: $2.60
A process costs $200 to set up. The run time is 5 minutes per piece and the run cost is $30 per hour. Determine the fixed cost?
A. $250.00
B. $200.00
C. $340.00
D. $300.00
Pareto analysis can be used:
A. to select problems with the greatest economic impact
B. to identify process bottleneck
C. To manage excessive overtime
D. To locate employee grievances with true assignable causes
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only APICS exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CPIM-MPR exam preparations and APICS certification application, do not hesitate to visit our Vcedump.com to find your solutions here.