  • Question 181:

    Measurement System Analysis is a procedure used to quantify variation of the method or system used for taking measurements.

    A. True
    B. False

  • Question 182:

    When two Inputs have an impact on the Output together yet seem to have no or little impact on their own this is called a/an ________________.

    A. Interaction
    B. Oddity
    C. Coincidence
    D. Impossibility

  • Question 183:

    The deviation of the measured value from the actual value regardless of the operator is known as ______________.

    A. Linearity
    B. Bias
    C. Repeatability
    D. Movement

  • Question 184:

    Use of the ________ approach is the most classic arrangement when constructing a Fishbone Diagram.

    A. Chronological
    B. 6M
    C. 5M
    D. Alphabetical

  • Question 185:

    Hypothesis Testing can save time and help avoid high costs of experimental efforts by using existing data.

    A. True
    B. False

  • Question 186:

    When constructing a Fishbone Diagram using the ________ approach is the most classic arrangement.

    A. 6M
    B. 4M
    C. 5M
    D. Alphabetical

  • Question 187:

    Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).

    A. The lower Control Limit for the R chart is equal to zero
    B. The Control Limits are wider than the customer specification limits
    C. A process is in Statistical Control before implementation of SPC
    D. Attempt to use SPC for tracking transaction times at a warehouse
    E. Indication of the specification limits on the Control Chart

  • Question 188:

    The Purchase Orders for Glenn Manufacturing Company were being copied by an employee and sent to four different departments yet only one department took an action based on the information in the PO. This is an example of ____________.

    A. External Failure Costs
    B. Appraisal Costs
    C. Internal Failure Costs
    D. Prevention Costs

  • Question 189:

    Lean Enterprise is based on the premise that anywhere work is being done which of these is also occurring?

    A. Money is being spent
    B. Waste is being generated
    C. People are producing value added product
    D. Waste is being eliminated

  • Question 190:

    Non-parametric testing is done when which of these are applicable? (Note: There are 3 correct answers).

    A. When the traditional t tests don't produce the results we need
    B. A Hypothesis Test for the Median of the population is in question
    C. It does not require data to come from Normally Distributed populations
    D. They look at the Median rather than the Mean of populations
    E. When there are no parameters to measure in the process

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CLSSGB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.