SAP C_TS422_2023 Online Questions & Answers

  • Question 1:

    What is the difference between co-products and by-products?

    A. Only co-products are identified by a special item category in the bill of material (BOM)
    B. Only co-products can be manufactured in isolation from the main product
    C. Only co-products have a zero inventory valuation
    D. Only co-products appear in the process or production order settlement rule

  • Question 2:

    Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question

    A. Production cost collector
    B. Repetitive manufacturing profile
    C. Routing
    D. Production version

  • Question 3:

    You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

    A. NO bills of material (BOMs) are assigned to the production versions.
    B. All production versions for the material are locked.
    C. The order lot size is NOT within the validity range of a production version.
    D. NO production lines are assigned to the production versions.

  • Question 4:

    Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

    A. To increase the number of planning levels
    B. To simplify the structure of bills of material
    C. To reduce the number of material masters
    D. To make the assignment of components easier
    E. To reduce the number of changes required in bills of material

  • Question 5:

    How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

    A. By Plant
    B. By Period
    C. By Industry
    D. By Material Status

  • Question 6:

    Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.

    A. Goods receipt processing time
    B. Move time
    C. Wait time
    D. Float after production
    E. Queue time

  • Question 7:

    When you create a sales order

    When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?

    A. When MRP creates a dependent requirement
    B. When MRP creates a planned order
    C. When you create a sales order
    D. When MRP creates a planned order

  • Question 8:

    Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

    A. Changing the storage bin in warehouse management
    B. Changing the procurement type in the product master
    C. Changing the operation times in the production data structure
    D. Changing the stock in inventory management
    E. Changing the purchasing contract in materials management

  • Question 9:

    What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

    A. The Finite Scheduling indicator is NOT set in the strategy profile.
    B. The work center has several individual capacities
    C. The Change Planning Direction indicator is set in the strategy profile
    D. Alternative work centers are fully occupied.

  • Question 10:

    For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

    A. The deletion flag must NOT be set for the bill of material (BOM) or the routing
    B. The lot size range must be within the lot size range of the assigned routing.
    C. The assigned routing and bill of material (BOM) must be valid in the entirevalidity period.
    D. The assigned routing must be a rate routing.
    E. The assigned routing must NOT have alternative sequences

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TS422_2023 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.