Which information is required when you created a production master in SAP S/4HANA? (Choose 2)
A. Selective screen for views
B. Product type
C. Base unit of measure
D. Industry sector
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have? (Choose 2)
A. Model a transportation resorce in the location master.
B. Model a seperate resource in the production data structure.
C. Model a resource inbound in the location master.
D. Model a handling resource in the location master and goods receipt time in the material master.
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing? (Choose 3)
A. Posting of production costs to the production cost collector
B. Material staging for nex order in sequence
C. Archiving of documents for assembly scrap
D. Posting of goods receipt for the product
E. Reduction of associated capacity requirements
How can SAP S/4HANA support a GMP-compliant production process? (Choose 3)
A. Approved resources
B. GMP-compliant flag
C. Recipe approval
D. Batch record
E. Digital signature
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA? (Choose 2)
A. First in first out (FIFO)
B. 100% check
C. Simultaneous
D. By usage probability
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? (Choose 3)
A. SAP Ariba
B. SAP Hybris
C. SAP Concur
D. SAP Fieldglass
E. SAP SuccessFactors
Which of the following questions do you have to answer before you start creating a BOM? (Choose 2)
A. In which storage location is the BOM required?
B. Which Valid To information is necessary?
C. Is the material type allowed in the BOM?
D. What status does the BOM have?
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing? (Choose 2)
A. The work center has several invidula capacities.
B. The finite Scheduling indicator is NOT set in the strategy profile.
C. The Change Planning Direction indicator is set in strategy profile.
D. Alternative work centers are fully occupied.
What type of time element can be reduced by strategy settings while dispatching? (Choose 2)
A. Transportation time
B. Wait time
C. Queue time
D. Setup time
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
A. When multiple operations are maintained for one product
B. When alternate resources are used within one operation
C. When multiple planned orders exist on one resource
D. When multiple production versions are maintained for one product
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TS422_2020 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.