  • Question 11:

    How the settlement rule for suborder is to be determine in the Customizing setting for order type.

    Please choose the correct answer.

    Response:

    A. Copy the main order as the settlement receiver
    B. Do not copy order
    C. Apply CATS
    D. None of the above

  • Question 12:

    Which standard aggregation of data does the Plant Maintenance Information System (PMIS) use? (Choose three)

    A. By info source
    B. By characteristics
    C. By data source
    D. By date period
    E. By key figures

  • Question 13:

    Your customer wants to assign maintenance orders to network actMties automatically with the Maintenance Event Builder (MEB).

    Which of the following steps must you perform?

    There are 2 correct answers to this question.

    Response:

    A. Set the define Transfer of Project or Invest Program indicator.
    B. Assign maintenance orders manually to a revision with revision type WPS-controlled.
    C. Assign a network to a revision with revision type WPS-controlled.
    D. Assign a hierarchical task list to a notification.
    E. Assign the Reference PM/PS element to task list headers and network actMties.

  • Question 14:

    Where do you define initial and subsequent buffers for the maintenance plan strategy?

    A. In the maintenance item
    B. In the maintenance plan category settings
    C. In the maintenance package for the maintenance strategy
    D. In the maintenance plan scheduling parameters

  • Question 15:

    What happens when you set the system status in a maintenance order to technically completed (TECO)? There are 2 correct answers to this question. Response:

    A. The system sets a deletion indicator for outstanding reservations.
    B. The system sets a deletion indicator for outstanding purchase requisitions.
    C. The system posts costs to the target account assignment.
    D. The system sets a deletion indicator for purchase orders assigned to the maintenance order.

  • Question 16:

    What is the purpose of the usage list for equipment history? There are 2 correct answers to this question. Response:

    A. To display changes to history-related fields in an equipment master record
    B. To display the list of previous equipment operators
    C. To document the number of breakdowns for an object
    D. To track where the equipment was installed

  • Question 17:

    For which business requirements must you use serial numbers? (Choose two)

    A. To uniquely identify inventory material items
    B. To have a future option to track material items as pieces of functional locations
    C. To have a future option to track material items as pieces of equipment
    D. To have the option to track batches

  • Question 18:

    What are the prerequisites for order settlement? (Choose three)

    A. The order must be technically completed.
    B. The order has not been settled previously.
    C. A settlement rule must be created for the order.
    D. The order must be released.
    E. The settlement profile used in the order type must allow settlement.

  • Question 19:

    A maintenance technician replaces a defective counter with a new counter. Before the users can create a standard measuring document for the new counter, what step(s) must they perform? Please choose the correct answer. Response:

    A. Create a new technical object to represent the new measuring point.
    B. Create a special measuring document and set the Counter Replacement indicator.
    C. Dismantle the old measuring point and create a new measuring point.
    D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.

  • Question 20:

    Which scheduling parameter adjusts the cycle intervals of a maintenance strategy for each maintenance plan?

    A. The call horizon
    B. The early and late shift factors
    C. The early and late tolerance
    D. The cycle modification factor

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TPLM30_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.