C4040-109 Exam Details

  • Exam Code
    :C4040-109
  • Exam Name
    :Virtualization Technical Support for AIX and Linux - v2
  • Certification
    :IBM Certifications
  • Vendor
    :IBM
  • Total Questions
    :180 Q&As
  • Last Updated
    :Dec 30, 2019

IBM C4040-109 Online Questions & Answers

  • Question 121:

    A Power Systems server is configured with a VIO server and several client LPARs. The administrator wants to use the padmin user to create a script, which will run on the VIO server to back it up to a remote system. Script output must be collected. How can this be achieved?

    A. Create a backup script in /home/padmin Run the script redirecting stdout and stderr to a log file
    B. Create a backup script in /usr/ios/cli Run "crontab -e root" to configure root to run it and redirect the output
    C. Create a backup script in /home/padmin Use ssh from a remote system to run the script and capture the output on the remote system.
    D. Create a backup script in /usr/ios/cli Use the "script" command in the shell program, to collect the output.

  • Question 122:

    A system administrator needs to configure a redundant network environment for several AIX and Linux clients on a Power Systems server. Which highly available Virtual I/O server network solution should be used to meet this requirement?

    A. Shared Ethernet Adapter Failover
    B. Network Interface Backup
    C. Link Aggregation
    D. VLAN tagging

  • Question 123:

    How can an existing AIX 5.2 LPAR, which is using SAN storage, be migrated into a versioned WPAR (Workload Partition)?

    A. Using LPM, but downtime will be required.
    B. Dynamically using LAM.
    C. Backup and restore a mksysb.
    D. Rezone the SAN storage and use NPIV.

  • Question 124:

    What is necessary to install and configure IVM to use the network interface?

    A. SSH Key Manager
    B. A serial connection
    C. The IBM HTTP Server
    D. A private IP address

  • Question 125:

    An administrator has installed a Linux LPAR using virtual storage and virtual networking on a POWER7 system and is attempting to DLPAR additional memory into the LPAR. They see the following error message during the DLPAR operation.

    Which action will resolve this issue?

    A. Add the HMC to the /etc/hosts file.
    B. Configure a network on the same subnet on the HMC.
    C. Install the IBM Installation Toolkit for Linux
    D. Upgrade the version on Linux to support memory DLPAR.

  • Question 126:

    An administrator is attempting to install a VIO server on a Power 750, but is unable to connect remotely to the console session. How can this be resolved?

    A. Select the option to enable remote operation
    B. Select the option to enable remote virtual terminal connections.
    C. Use the vtmenu command to enable the virtual connection for the server.
    D. Ensure the remote console daemon is running on the host.

  • Question 127:

    Compared to the backup strategy for a VIO Server, what additional element needs to be backed up in an IVM deployment?

    A. LPAR profile data
    B. LHEA port allocation
    C. Storage pool definitions
    D. PowerVM Edition keys

  • Question 128:

    The wlmstat -@ 2 command has been run from a global environment with the following results: What action can an administrator take to set limits, so that both server1 and server2 use the same amount of CPU resources?

    A. Use the cpu_deallocate -P command to reduce the CPU resources on server2
    B. Use the chsysres command to assign the same CPU attributes to both servers.
    C. Use the chwpar -R command to set the CPU attributes for each server.
    D. Use the syncwpar -E command to copy the CPU resource allocation from server1 to server2.

  • Question 129:

    A new Power 750 machine is being prepared for use. When the administrator tries to assign a new LPAR to a secondary shared processor pool, the HMC displays the following error:"This operation is not allowed because the partition is using dedicated processors."What is the most likely cause for the error?

    A. The defined LPAR has yet to be activated.
    B. The defined LPAR has been set to the wrong Processor compatibility mode.
    C. The defined LPAR has the "Allow when partition is active" option checked.
    D. The defined LPAR has the "Allow when partition is inactive" option unchecked.

  • Question 130:

    Which of the following statements is true when mirroring of the VIO server rootvg?

    A. Only the root user can perform mirroring.
    B. Mirroring is active when the command completes.
    C. Mirroring operations must be performed from a virtual console.
    D. A system reboot will immediately occur upon completion of mirroring.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C4040-109 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.