Exam Details

  • Exam Code
    :C2070-991
  • Exam Name
    :IBM FileNet P8 V5.5.3 Deployment Professional
  • Certification
    :IBM Certifications
  • Vendor
    :IBM
  • Total Questions
    :60 Q&As
  • Last Updated
    :Dec 04, 2024

IBM IBM Certifications C2070-991 Questions & Answers

  • Question 11:

    The customer environment is highly available with two IBM FileNet Content Platform Engine (CPE) servers (node 1 and node 2) and Workplace XT. Both node 1 and node 2 are fronted by a hardware load balancer.

    Which of the following steps BEST describes how to test the CPE's high availability?

    A. While nodes 1 and 2 are running, create a document via Workplace XT, verify document exists, shutdown node 1, check-out newly created document, bring node 1 back up, shutdown node 2, check-in the document with new content and bring node 2 back up.

    B. While node is running, create a document via Workplace XT, verify document exists, shutdown node 1, start node 2, check-out newly created document, bring node 1 back up, shutdown node 2, check-in the document with new content and bring node 2 back up.

    C. While nodes 1 and 2 are running, disable the hardware load balancer, create a document via Workplace XT, verify document exists, shutdown node 1, check-out newly created document, bring node 1 back up, shutdown node 2, check-in the document with new content and bring node 2 back up.

    D. While nodes 1 and 2 are running, create a document via Workplace XT, verify document exists, shutdown node 1, check-out newly created document, disable the hardware load balancer, bring node 1 back up, shutdown node 2, check-in the document with new content, bring node 2 back up and enable hardware load balancer.

  • Question 12:

    Consultants for a shipping company need to configure Single Sign-On (SSO) to their IBM Content Platform Engine system servers. They decide to use Kerberos for SSO authentication between.NET applications or their products that use it.

    Which directory server is required to accomplish the above scenario?

    A. Novell eDirectory

    B. Tivoli Directory Server

    C. Microsoft Active Directory

    D. Oracle Internet Directory 11g

  • Question 13:

    A customer is preparing to install and deploy IBM FileNet P8 Content Platform Engine (CPE) V5.2.1. Prior to the installation, which two of the following entities must already exist?

    A. IBM Case Foundation

    B. IBM CPE V5.2.1 Client

    C. J2EE application server

    D. Database for object stores

    E. IBM Content Search Services

  • Question 14:

    A P8 system administrator is preparing to upgrade the Process Engine in an IBM FileNet P8 V5.1 environment to V5.2.1.

    What instructions need to be issued to stop the Process Engine before the upgrade?

    A. Logon to the Process Engine server as fnsw and issue an `initfnsw y stop' command.

    B. Logon to the WebSphere Administration Console and stop the IBM Content Platform Engine.

    C. Logon to the Process Engine and issue a `Process_Engine_installation_direcory/stoppemgr' command.

    D. Logon to the Process Engine server as fnsw, open Process Task Manager, select the Process Services node and click stop.

  • Question 15:

    A company is upgrading their IBM FileNet P8 environment to Content Platform Engine (CPE) V5.2.1 on the same system where the Content Engine was previously installed.

    Which of the following steps is required to upgrade to CPE V5.2.1?

    A. Upgrade to the latest version of the application server.

    B. They must upgrade to Microsoft.NET Framework V4.5.2.

    C. Logon as the same user who originally installed that software.

    D. Stop the application server process before running the CPE V5.2.1 installer.

  • Question 16:

    A P8 administrator will be installing the IBM FileNet P8 Content Engine software onto multiple servers and would like to install it silently.

    Which file and parameters will need to be updated?

    A. cpe_silent_install.txt.file, LICENSE_ACCEPTED, USER_INSTALL_DIR

    B. ce_silent_install.txt.file, CHOSEN_INSTALL_FEATURE_LIST, CCL_URL

    C. ce_silent_install.txt.file, JAVA_HOME, LICENSE_ACCEPTED, LAUNCH_CM

    D. cpe_silent_install.txt.file, USER_INSTALL_DIR, LAUNCH_CM, CCLWCM_URL

  • Question 17:

    A company has completed installing and setting up a single-server IBM FileNet P8 Content Platform system using the Composite Platform Installation Tool (CPIT).

    Which application should be used to log on to verify if a user can successfully browse, search, add a document and vies the Tasks page?

    A. Process Task Manager

    B. IBM FileNet Workplace XT

    C. FileNet Enterprise Manager

    D. Administration Console for Content Engine

  • Question 18:

    A FileNet system administrator is configuring a new Fixed Storage Device for their IBM FileNet P8 Domain. What is the order of steps to create storage related items needed to complete this task?

    A. Fixed Content Device, Staging Area, Storage Area.

    B. Storage Area, Staging Area, Fixed Storage Device.

    C. Fixed Content Device, Storage Area, Replication Group.

    D. Fixed Content Device, Replication Group, Working Area.

  • Question 19:

    A large government agency has just implemented SSL on one their IBM FileNet Content Manger V5.2.1 systems.

    What type of encryption is used when generating a shared secret key?

    A. In-place

    B. Hashing

    C. Symmetric

    D. Asymmetric

  • Question 20:

    Which of the following logs can be checked for errors if the Composite Platform Installation Tool (CPIT) does not complete the installation?

    A. /cpit/cpit_install_stderr.txt and /cpit/cpit_install_stdout.txt

    B. /cpit/cpit_install_stderr.txt, /cpit/cpit_install_stdout.txt, and IBM WebSphere Application Server logs

    C. /cpit/cpit_install_stderr.txt, /cpit/cpit_install_stdout.txt, and IBM WebSphere Application Server and IBM DB2 database logs

    D. /cpit/cpit_install_stderr.txt, /cpit/cpit_install_stdout.txt, and IBM WebSphere Application Server, IBM DB2 database and Microsoft Active Directory logs

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C2070-991 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.