To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.
A. Measurement automation
B. Operator alertness
C. Full Automation
D. Constant supervision
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
A. True
B. False
An important factor in a viable _________ is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.
A. Control Plan
B. FMEA
C. Standard Operating Procedure
D. Process Map
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as ____________ .
A. Ishikawa
B. Kaizen
C. Kanban
D. Muda
To minimize waste through the application of Lean Principles we do which of the following?
A. Collect sample data
B. Keep the work area clean and organized
C. Calibrate our measurement tools
D. Survey the customer
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of supporting the Response Plan in case a defect is noticed.
A. X-Y Diagram
B. Shewhart Chart
C. FMEA
D. Customer Service Plan
One of the 5S approaches to eliminating waste is to organize all tools, information and inventory utilized at a workstation in such a manner that the operator knows exactly where things are when needed. This 5S tool is called __________________.
A. Standardizing
B. Scheduling
C. Sustaining
D. Straightening
Lean Principles defines for us seven specific areas where ________ typically exists in our processes.
A. Waste
B. Excess inventory
C. Variation
D. Data error
A ______________ is a graphical presentation of sample data that shows the number of times that a data point is a specific number.
A. Fishbone Diagram
B. Histogram
C. Pie Chart
D. Box Plot
A tool we use to identify possible failures (defects) in our process and the impact they may have is the _________________.
A. Shewhart Analysis
B. Juran Journey
C. FMEA
D. SIPOC
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IASSC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ICYB exam preparations and IASSC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.