ASQ ASQ Six Sigma Green Belt CSSGB Questions & Answers

  • Question 21:

    The acronym for the defined approach taken by Lean Six Sigma to solve significant challenges related to a process is which of these?

    A. DOE

    B. DMAIC

    C. SIPOC

    D. FMEA

  • Question 22:

    Training cost $6,500 and a project required an initial investment of $47,500. If the project yields monthly savings of $3,500 beginning after 4 months, what is the payback period in months, before money costs and taxes?

    A. 9.7

    B. 15.4

    C. 19.4

    D. 23.7

  • Question 23:

    Six Sigma refers to a process whose output has at least 80% of its data points within +/- 6 Standard Deviations from the Mean.

    A. True

    B. False

  • Question 24:

    In the late 1980's William Smith coined the name Six Sigma for a methodology that had its origins at __________________ for quality related work being done there.

    A. Honeywell

    B. Allied Signal

    C. General Electric

    D. Motorola

  • Question 25:

    SPC charts typically have the most recent data point on the right hand side.

    A. True

    B. False

  • Question 26:

    Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).

    A. The lower Control Limit for the R chart is equal to zero

    B. The Control Limits are wider than the customer specification limits

    C. A process is in Statistical Control before implementation of SPC

    D. Attempt to use SPC for tracking transaction times at a warehouse

    E. Indication of the specification limits on the Control Chart

  • Question 27:

    The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which of these? (Note: There are 4 correct answers).

    A. Process control teams should not control a process based on SLs

    B. Displaying the SLs on a Control Chart sends a wrong signal toward process control

    C. Marking the SLs on a Control Chart is against the principle of charting

    D. By marking the SLs, one can confuse the operator as to what limits are critical

    E. By using mere Control Limits the process only needs to be in Statistical Control

  • Question 28:

    Examples of Mistake Proofing for a laptop computer include which of these? (Note: There are 2 correct answers).

    A. USB connection for a mouse

    B. Open/Close button for CD Drive

    C. Battery alignment pins

    D. On/Off switch for computer

  • Question 29:

    As part of a Visual Factory plan Kanban cards are created and utilized to identify areas in need of cleaning and organization.

    A. True

    B. False

  • Question 30:

    The practice of utilizing Poka-Yoke is also known as ________________.

    A. Thorough integration

    B. Mistake proofing

    C. On site inspection

    D. Lean controls

Related Exams:

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ASQ exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CSSGB exam preparations and ASQ certification application, do not hesitate to visit our Vcedump.com to find your solutions here.