After a server power failure, the administrator noticed the scheduled resyncing in the cluster monitor displays objects to be resynchronized under the pending category.
Why are there objects in this category?
A. The delay timer has not expired.What is the purpose of host rebuild reserve in vSAN?
A. Reserves space for internal operationsA vSAN administrator is using the vSAN ReadyNode Sizer to build a new environment. While entering the cluster configurations, a fellow colleague inquires about the Operations Reserve option.
What is the purpose of using this option?
A. Provides space for internal operationsAn existing vSAN OSA cluster has this specification:
Four ESXi hosts with all flash configuration Each with two disk groups Each disk group with one cache device and four capacity devices There are five more device slots available per host
The CTO would like to provision new applications, and these will need more capacity and performance.
Which two methods should be used by the vSAN administrator to meet this goal with the least amount of impact? (Choose two.)
A. Replacing all capacity devices with a similar larger deviceThe DevOps team of an organization wants to deploy with persistent storage on a dedicated vSAN cluster. The storage administrator is tasked to configure the vSAN cluster and leverage the vSAN Direct feature.
Which two requirements must the administrator meet to complete this task? (Choose two.)
A. A valid vSAN license for the vSAN clusterAn administrator has 24 physical servers that need to be configured with vSAN. The administrator needs to ensure that a single rack failure is not going to affect the data availability. The number of racks used should be minimized.
What has to be done and configured to achieve this goal?
A. Distribute servers across at least two different racks and configure two fault domainsA vSAN administrator wants to transition from VMware Update Manager to vSphere Lifecycle Manager. Which element is a mandatory requirement to create an image?
A. ESXi VersionA customer wishes to host a new range of applications with high-performance requirements, specifically, low latency. The current vSAN platform is based on ReadyNode hardware and uses a vSAN 7.0 U2 hybrid topology configuration.
Which would satisfy the customer's requirement?
A. Deploy the application on a new cluster with vSAN 8.0 ESA using a new hardware designA vSAN administrator has two identical VMware vSAN clusters, one for staging workloads and another for production workloads. Due to an unforeseen capacity requirement, the vSAN administrator is tasked with merging the staging vSAN cluster into the production.
Which three actions should the vSAN administrator perform on the staging cluster prior to moving the vSAN nodes to the production cluster? (Choose three.)
A. Disable vSAN ServicesWhich two considerations should an architect assess when designing a HCI Mesh solution with VMware vSAN and VMware vSphere High Availability (HA)? (Choose two.)
A. A server vSAN cluster can serve its local datastore up to five client vSAN clusters.Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only VMware exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 5V0-22.23 exam preparations and VMware certification application, do not hesitate to visit our Vcedump.com to find your solutions here.