1Z0-1002 Exam Details

  • Exam Code
    :1Z0-1002
  • Exam Name
    :Oracle Manufacturing Cloud 2018 Implementation Essentials
  • Certification
    :Oracle Certifications
  • Vendor
    :Oracle
  • Total Questions
    :65 Q&As
  • Last Updated
    :Dec 08, 2021

Oracle 1Z0-1002 Online Questions & Answers

  • Question 11:

    In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.

    A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost

    accounting.

    Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting in frozen type.

    A. Publish cost planning scenario to Accounting.
    B. Build cost planning scenario and perform cost roll up.
    C. Create Accounting Distributions.
    D. Transfer transactions from production to Costing.
    E. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.
    F. Transfer Transactions from Inventory to Costing.

  • Question 12:

    In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can report the excess production completion?

    A. Overcompletion Tolerance Type = Amount, value > 0
    B. Overcompletion Tolerance Type = Amount, value = 0
    C. Overcompletion Tolerance Type = Percentage, value = 100
    D. Overcompletion Tolerance Type = Percentage, value > 0
    E. Overcompletion Tolerance Type = Percentage, value = 0

  • Question 13:

    An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order.

    Identify two options that can cause this situation.

    A. Sourcing rules for the product item are defined as Make as well as Transfer.
    B. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.
    C. Sourcing rules for the product item are defined as Buy as well as Transfer.
    D. Sourcing rule for the product item is defined as Buy.

  • Question 14:

    As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager. What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

    A. The Supply Chain Orchestration Functional Area
    B. The Manufacturing Master Data Functional Area
    C. The Manage Items Profile Options tasks
    D. The Manage product and Child Value Sets task

  • Question 15:

    Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.

    Which three steps must be completed and verified in the Work Definition area?

    A. Ensure the predefined work definition name ORA_MAIN name is active.
    B. Select a resource that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
    C. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
    D. Ensure the item is a standard item with a secondary item structure.
    E. Ensure there is only one default standard operation at a given point in time.

  • Question 16:

    Your customer has the following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component.

    Identify the way to establish the relationship between Pallet and Engine Work Definitions.

    A. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for Engine.
    B. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet.
    C. The two Work Definitions can be tied through Project or Seiban numbers.
    D. The Work Definition versions can be used to tie the Work Orders.

  • Question 17:

    A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift. Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

    A. Manage Work Orders
    B. Review Dispatch List
    C. Report Resource, Material and Operation Transactions
    D. Review Production Transaction History

  • Question 18:

    The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift.

    Identify the correct sequence of steps to achieve this requirement.

    A. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
    B. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
    C. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
    D. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.

  • Question 19:

    A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day. Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

    A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
    B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.
    C. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
    D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.

  • Question 20:

    A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management. Which scheduled process should you run to achieve this requirement?

    A. Transfer Cost to Cost Management
    B. Transfer Transactions to Costing
    C. Transfer Ledger Balances
    D. Transfer General Ledger Balances to Balance Cubes

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Oracle exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 1Z0-1002 exam preparations and Oracle certification application, do not hesitate to visit our Vcedump.com to find your solutions here.