E20-555 Web TestEngine demo

Exit VCEDump E20-555 Isilon Solutions and Design Specialist for Technology Architects
Question 47 of 52
0% complete
Q47 Single choice

An Isilon customer has two 5-node clusters; one for production and one for disaster recovery (DR). The
customer's workflows are replicated to the DR cluster through SyncIQ on individual schedules. They have shut down their production cluster for scheduled maintenance, failed over to the DR cluster, and are currently operating from the DR site.

Assume both clusters have identical shares, exports, user authentication. In addition, assume the client applications have been stopped and the DNS re-pointed.

What is the easiest SyncIQ Policy method to continue operations on production?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in