E20-555 Web TestEngine demo

Exit VCEDump E20-555 Isilon Solutions and Design Specialist for Technology Architects
Question 1 of 52
0% complete
Q1 Single choice

An Isilon customer has two 5-node clusters; one for production and one for disaster recovery (DR). The
customer's workflows are replicated to the DR cluster through SyncIQ on individual schedules. They shut down their production cluster for a scheduled DR test, failed over to the DR cluster, and continue their DR testing.

Assume both clusters have identical shares, exports, and user authentication. Additionally, assume the client applications have been stopped and the DNS re-pointed.

Which SyncIQ Policy method should be used to continue production operations?

Previous Check answer

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in