NCP-MCI-6.10 Web TestEngine demo

Exit VceDump NCP-MCI-6.10 Nutanix Certified Professional - Multicloud Infrastructure (NCP-MCI v6.10)
Question 28 of 30
0% complete
Q28 Single choice

A new employee has inherited a partially configured Disaster Recovery (DR) schema. Source workloads have been identified and Nutanix Guest Tools has been installed. There are two Protection Polices in place, one with an asynchronous schedule with a 1-hour RPO and a second policy utilizing synchronous replication. All of these workloads need to be recovered at a DR location and this will be orchestrated by Prism Central Recovery Plans.

What is the best way to setup this recovery orchestration?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in