HPE6-A66 Web TestEngine demo

Exit VCEDump HPE6-A66 Aruba Certified Design Associate
Question 2 of 9
0% complete
Q2 Single choice

A company has two buildings on a campus that are approximately 700 feet (214 meters) apart with a clear
line of site. No fiber exists between the buildings; however, there is a need for connecting the networks in
the buildings together. The connection between the two buildings will need to support peak rates over 1
Gbps.

Which solution should the company choose that will meet their requirements as well as being cost-effective?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in